Investigation and research on some engineering geological problems in construction of bridges across the Changjiang River

被引:0
|
作者
Xu, F. [1 ]
Shi, L. [1 ]
机构
[1] Investigation and Survey Bureau, Changjiang River Water Rsrc. Comm., Wuhan 430010, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Since the 90s, 20th century, the construction of big traffic bridges across middle-lower reaches of the Changjiang River has stepped into fast development. So far, bridges in Huangshi, Tongling, Jiangyin, Wuhan, and Nanjing have been in transport service. Still, some bridges are under construction and design. Various engineering geological problems have occurred, such as fault, soft interlayers, extreme softrocks, karst caves, and so on. In addition to common methods of investigation and mechanical test, the rheology test of softrocks, color video recordings, the field bearing test, and the pier analogue simulating have been taken to deal with the problems. The practice has provided dependable data for bridge design, which has been proved successful in the construction of bridges, and will be of treasury experience for the future bridge construction in middle-lower reaches of the Changjiang River.
引用
收藏
页码:377 / 380
相关论文
共 50 条
  • [31] Research on hazard prone geological genes and major engineering geological problems in tectonic mélange belts of Tibetan Plateau
    Zhang Y.
    Wang D.
    Li X.
    Wu R.
    Tang Y.
    Ren S.
    Li J.
    Luo L.
    Dizhi Xuebao/Acta Geologica Sinica, 98 (03): : 992 - 1005
  • [32] Geological engineering problems associated with tunnel construction in karst rock masses: The case of Gavarres tunnel (Spain)
    Alija, S.
    Torrijo, F. J.
    Quinta-Ferreira, M.
    ENGINEERING GEOLOGY, 2013, 157 : 103 - 111
  • [33] Investigation and mapping of geological construction materials in parts of chemoga river sub basin, debre markos, Ethiopia
    Zewdie, Mulusew Minuyelet
    Asmare, Dawit
    HELIYON, 2023, 9 (03)
  • [34] Engineering geological evaluation of some rocks from Akure, Southwestern Nigeria as aggregates for concrete and pavement construction
    Ademila, Omowumi
    GEOLOGY GEOPHYSICS AND ENVIRONMENT, 2019, 45 (01): : 31 - 43
  • [35] Research on the problems of project management of the oil-gas construction engineering in China
    Sun Yanbin
    Wang Jingzhong
    Wei Wei
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 434 - 437
  • [36] MAIN ENGINEERING-GEOLOGICAL PROBLEMS OF CONSTRUCTING THE HOA-BINH HYDRO DEVELOPMENT ON THE DA RIVER (VIETNAM).
    Molokov, L.A.
    Skiba, S.I.
    Dobrin, E.Z.
    Hydrotechnical Construction, 1985, 19 (02): : 101 - 107
  • [37] SNOW CREEP - ITS ENGINEERING PROBLEMS AND SOME TECHNIQUES AND RESULTS OF ITS INVESTIGATION
    MATHEWS, WH
    MACKAY, JR
    CANADIAN GEOTECHNICAL JOURNAL, 1975, 12 (02) : 187 - 198
  • [38] Some Problems on Traffic Civil Engineering Speciality Construction of China Higher Vocational Education
    Yang Zhuanyun
    2010 INTERNATIONAL CONFERENCE ON EDUCATION AND SPORTS EDUCATION, VOL 1, 2010, : 256 - 260
  • [40] Some scientific problems facing research on hydrological processes in an inland river basin
    Kang E.
    Chen R.
    Zhang Z.
    Ji X.
    Jin B.
    Frontiers of Earth Science in China, 2008, 2 (4): : 384 - 392