Overhead contact line design of the Lötschberg basetunnel

被引:0
|
作者
Hahn, Gunter [1 ]
机构
[1] Siemens AG, Transportation Systems, Electrification TS EL EN1, Postfach 3240, 91050 Erlangen
来源
eb - Elektrische Bahnen | 2007年 / 105卷 / 4-5期
关键词
Installation - Locomotive cranes - Transportation - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
The Lotschberg-basetunnel is part of a high-performance rail connection between Central Switzerland and Italy with links to the trans-European high-speed rail system. The 34,6km long installation comprises two single track tunnel tubes, has been designed for 250 km/h and will commence scheduled commercial services in December 2007. The tunnel tubes have been prepared for trains with over-size gauge to transport trucks. The installation has been electrified with AC 15 kV 16,7Hz adopting a contact line design adapted to the requirements of the tunnel and prepared for the conversion to the over-size gauge.
引用
收藏
页码:284 / 289
相关论文
共 50 条
  • [21] Overhead Power Line Design in Market Conditions
    Beryozkina, Svetlana
    Petrichenko, Lubov
    Sauhats, Antans
    Jankovskis, Nauris
    2015 IEEE 5TH INTERNATIONAL CONFERENCE ON POWER ENGINEERING, ENERGY AND ELECTRICAL DRIVES (POWERENG), 2015, : 278 - 282
  • [22] Design tool optimizes overhead line profiles
    Chandrasekharan, NV
    Gopi, CK
    IEEE COMPUTER APPLICATIONS IN POWER, 2000, 13 (03): : 43 - 47
  • [23] Mechanisms Analysis and Countermeasure of Electrical Contact Overheating of Overhead Line
    Chang Jinbing
    Wang Guogang
    Liu Huijun
    2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014, : 1503 - 1508
  • [24] Kombilösung Karlsruhe – Overhead contact line and lighting installations
    Brauch, Heiko
    eb - Elektrische Bahnen, 2022, 120 (08): : 316 - 320
  • [25] An alarm to warn of overhead power line contact by mobile equipment
    Homce, GT
    Cawley, JC
    Yenchek, MR
    Sacks, HK
    CONFERENCE RECORD OF THE 2001 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-4, 2001, : 1376 - 1383
  • [26] Development of an overhead power line contact alarm for mobile equipment
    Homce, G. T.
    Cawley, J. C.
    Sacks, H. K.
    Yenchek, M. R.
    INTERNATIONAL JOURNAL OF HEAVY VEHICLE SYSTEMS, 2005, 12 (02) : 87 - 103
  • [27] Determination and Optimization of the Maintenance Frequencies in the Overhead Contact Line System
    Zorita, A. L.
    Duque, O.
    Fernandez, M. A.
    Garcia-Escudero, L. A.
    JOURNAL OF TRANSPORTATION ENGINEERING, 2010, 136 (11) : 964 - 972
  • [28] Conductor rail overhead contact line on the folding bridge in Anklam
    Schatkowski, Kay
    Furrer, Rico
    Wili, Urs
    eb - Elektrische Bahnen, 2015, 113 (6-7): : 342 - 346
  • [29] Overhead contact line elasticity optimization for railway highspeed running
    Galeotti, G
    Toni, P
    COMPUTERS & STRUCTURES, 1997, 65 (06) : 975 - 983
  • [30] Friction Properties at the Contact Interfaces of Overhead Line Aluminium Conductors
    Omrani, Amine
    Dieng, Lamine
    Langlois, Sebastien
    Van Dyke, Pierre
    IEEE TRANSACTIONS ON POWER DELIVERY, 2022, 37 (01) : 442 - 448