Research on new structural quay container crane

被引:0
|
作者
Jiangsu Maritime Institute, Nanjing 210016, China [1 ]
机构
来源
Adv. Mater. Res. | / 91-94期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Elevators
引用
收藏
相关论文
共 50 条
  • [21] Quay crane scheduling with handling priority in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    ENGINEERING OPTIMIZATION, 2008, 40 (02) : 179 - 189
  • [22] Quay crane allocation of container terminal based on cluster analysis
    Wang, Yu
    Huang, Youfang
    Zheng, Huiqiang
    Chang, Daofang
    Journal of Software, 2013, 8 (05) : 1201 - 1208
  • [23] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [24] Analysis of mathematic model on quay container crane simulation training
    Liang, Chengji
    Wang, Chonghua
    Liu, Lei
    Proceedings of the Sixth International Conference on Information and Management Sciences, 2007, 6 : 660 - 663
  • [25] Influence of Carbon Emission Constraint on Container Quay Crane Allocation
    Wang Wen Yuan
    Peng Yun
    Tang Guo Lei
    Song Xiang Qun
    ENVIRONMENTAL PROTECTION AND RESOURCES EXPLOITATION, PTS 1-3, 2013, 807-809 : 936 - 940
  • [26] Approximation algorithm for uniform quay crane scheduling at container ports
    Liu, Ming
    Zheng, Feifeng
    Xu, Yinfeng
    Chu, Chengbin
    DISCRETE MATHEMATICS ALGORITHMS AND APPLICATIONS, 2016, 8 (02)
  • [27] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [28] An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
    Tavakkoli-Moghaddam, R.
    Makui, A.
    Salahi, S.
    Bazzazi, M.
    Taheri, F.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 241 - 248
  • [29] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730
  • [30] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564