共 50 条
- [1] Disassembly and/or graph model used in evaluation of product's disassembly-recycling property [J]. Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2002, 38 (SUPPL.): : 26 - 31
- [3] Product Disassembly Model Based on hierarchy network graph [J]. ADVANCES IN LIFE CYCLE ENGINEERING FOR SUSTAINABLE MANUFACTURING BUSINESSES, 2007, : 267 - +
- [4] Disassembly AND/OR graph model for "disassembly for recycling" [J]. 2003 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2003, : 54 - 59
- [5] Product disassembly scheduling using graph models [J]. ENVIRONMENTALLY CONSCIOUS MANUFACTURING II, 2002, 4569 : 63 - 70
- [7] Evaluation model and algorithm of product disassembly process with stochastic feature [J]. Clean Technologies and Environmental Policy, 2012, 14 : 345 - 356
- [8] A study on the method of disassembly time evaluation of a product using work factor method [J]. 2003 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-5, CONFERENCE PROCEEDINGS, 2003, : 1753 - 1759
- [9] A graph-based approach to disassembly model for end-of-life product recycling [J]. NINETEENTH IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM - PROCEEDINGS, 1996 IEMT SYMPOSIUM, 1996, : 247 - 254
- [10] LEAST LEVELS DISASSEMBLY GRAPH METHOD FOR SELECTIVE DISASSEMBLY PLANNING [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 1A, 2014,