Disassembly AND/OR graph model for "disassembly for recycling"

被引:0
|
作者
Gao, JG [1 ]
Xiang, D [1 ]
Chen, HF [1 ]
Duan, GH [1 ]
Wang, JS [1 ]
机构
[1] Tsing Hua Univ, Dept Precis Instruments, Ctr Green Mfg, Beijing 100084, Peoples R China
关键词
disassembly for recycling; set AND/OR graph; disassembly AND/OR graph; sieve;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
There exists combination explosion during the course of modeling of AND/OR graph for disassembly planning for recycling, which induces it nearly impossible to handle product with numerous parts. To conquer the difficulty, set AND/OR graph (SAOG) is defined, and with the mapping from SAOG to product, complete disassembly AND/OR graph (DAOG) is presented. In order to ensure the validity and applicability of DAOG, several sieves are designed to delete the most of vertexes and edges. These sieves are successively applied to DAOG, and finally the complete DAOG becomes sieved DAOG which is the model used for disassembly planning. DAOG contains all possible disassembly actions, thus it provides a suitable basis for generation and evaluation of all possible disassembly sequences of an end-of-life product.
引用
收藏
页码:54 / 59
页数:6
相关论文
共 50 条
  • [1] A disassembly model for PC recycling
    Zhang, HC
    [J]. ADVANCED DESIGN AND MANUFACTURE IN THE GLOBAL MANUFACTURING ERA, VOL 1, 1997, : 113 - 118
  • [2] Disassembly and recycling
    Rupprecht, R
    [J]. INDUSTRIAL ROBOT, 1996, 23 (03): : 4 - 4
  • [3] An improved disassembly hybrid graph model for selective disassembly sequence planning
    Yin, Fengfu
    Wang, Kai
    Wang, Xiaodong
    Li, Lin
    Liu, Guangkuo
    Maani, Thomas
    Sutherland, John W.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2024, 238 (10) : 1519 - 1530
  • [4] Robots in recycling and disassembly
    Bogue, Robert
    [J]. INDUSTRIAL ROBOT-THE INTERNATIONAL JOURNAL OF ROBOTICS RESEARCH AND APPLICATION, 2019, 46 (04): : 461 - 466
  • [5] A graph-based approach to disassembly model for end-of-life product recycling
    Zhang, HC
    Kuo, TC
    [J]. NINETEENTH IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM - PROCEEDINGS, 1996 IEMT SYMPOSIUM, 1996, : 247 - 254
  • [6] A graph-based disassembly sequence planning for EOL product recycling
    Zhang, HC
    Kuo, TC
    [J]. TWENTY FIRST IEEE/CPMT INTERNATIONAL ELECTRONICS MANUFACTURING TECHNOLOGY SYMPOSIUM, 1997, : 140 - 151
  • [7] LEAST LEVELS DISASSEMBLY GRAPH METHOD FOR SELECTIVE DISASSEMBLY PLANNING
    Wang, Chenggang
    Mitrouchev, Peter
    Li, Guiqin
    Lu, Lixin
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 1A, 2014,
  • [8] Product Disassembly Model Based on hierarchy network graph
    Wang shuwang
    Zhang lei
    Huang haihong
    Liu zhifeng
    Pan xiaoyong
    [J]. ADVANCES IN LIFE CYCLE ENGINEERING FOR SUSTAINABLE MANUFACTURING BUSINESSES, 2007, : 267 - +
  • [9] On disassembly workshop model integration for disassembly planning
    Addouche, S
    Perrard, C
    Henrioud, JM
    [J]. PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 157 - 162
  • [10] Disassembly precedence graph generation
    Tumkor, Serdar
    Senol, Goeksel
    [J]. 2007 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND MANUFACTURING, 2007, : 70 - +