Disassembly precedence graph generation

被引:2
|
作者
Tumkor, Serdar [1 ]
Senol, Goeksel [1 ]
机构
[1] Istanbul Tech Univ, Dept Mech Engn, Istanbul, Turkey
关键词
D O I
10.1109/ISAM.2007.4288451
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Increasingly tough regulations and voluntary initiatives for the environment have pressured manufacturers to be more responsible for the end-of-life (EOL) treatments of their products. The industry has started to realize the importance of the sustainable products, which is only possible through the closed loop of the product life cycle. In order to establish an efficient closed loop of the product life cycle, mostly disassembly is necessary. One of the important issues of design for disassembly (DfD) is to evaluate ease of disassembly steps, so that designer can make decisions about sequences and level of disassembly. EOL Disassembly decisions are influenced by accessibility of the components, EOL options of the material, the environmental impact of the components and processes, the disassembly time, and the net benefit from the EOL recovery. Designers shall not to be assumed to be DID experts. Therefore some software tools to support designer to generate disassembly sequences, which can be used for evaluating the ease of disassembly have been developed. In this paper, the systematical search approach for disassembly precedence graph, the environmental impact an the cost calculation algorithm, which has been used in the EOL Recovery Information System (ERIS) are presented.
引用
收藏
页码:70 / +
页数:2
相关论文
共 50 条
  • [1] Generation of precedence constraints in disassembly
    Motevallian, B.
    Abhary, K.
    Luong, L. H. S.
    [J]. ANNALS OF DAAAM FOR 2004 & PROCEEDINGS OF THE 15TH INTERNATIONAL DAAAM SYMPOSIUM: INTELLIGNET MANUFACTURING & AUTOMATION: GLOBALISATION - TECHNOLOGY - MEN - NATURE, 2004, : 297 - 298
  • [2] Generation and application of precedence information for the planning of assembly and disassembly procedures
    Aguinaga, Iker
    Borro, Diego
    Matey, Luis M.
    [J]. 2007 5TH IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, VOLS 1-3, 2007, : 219 - +
  • [3] Disassembly petri net generation in the presence of XOR precedence relationships
    Moore, KE
    Gungor, A
    Gupta, SM
    [J]. 1998 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5, 1998, : 13 - 18
  • [4] Generation of precedence graphs for a product family using a disassembly approach
    Fouda, P
    De Lit, P
    Rekiek, B
    Delchambre, A
    [J]. PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2001): ASSEMBLY AND DISASSEMBLY IN THE TWENTY-FIRST CENTURY, 2001, : 226 - 231
  • [5] Disassembly sequence planning using a fast and effective precedence-based disassembly subset-generation method
    Zhang, Nan
    Liu, Zhenyu
    Qiu, Chan
    Cheng, Jin
    Tan, Jianrong
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2020, 234 (03) : 513 - 526
  • [6] A novel connector-knowledge-based approach for disassembly precedence constraint generation
    Li, JingRong
    Wang, QingHui
    Huang, Ping
    Shen, HongZhou
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4): : 293 - 304
  • [7] Selective disassembly sequence generation based on lowest level disassembly graph method
    Mitrouchev, P.
    Wang, C. G.
    Lu, L. X.
    Li, G. Q.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 80 (1-4): : 141 - 159
  • [8] A novel connector-knowledge-based approach for disassembly precedence constraint generation
    JingRong Li
    QingHui Wang
    Ping Huang
    HongZhou Shen
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 293 - 304
  • [9] Selective disassembly sequence generation based on lowest level disassembly graph method
    P. Mitrouchev
    C. G. Wang
    L. X. Lu
    G. Q. Li
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 80 : 141 - 159
  • [10] Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph
    Li, JR
    Khoo, LP
    Tor, SB
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 102 (01) : 51 - 65