A study on the method of disassembly time evaluation of a product using work factor method

被引:0
|
作者
Yi, HC [1 ]
Park, YC [1 ]
Lee, KS [1 ]
机构
[1] Youngam Univ, Dept Mech Engn, Kyungbuk, South Korea
关键词
disassemblity; disassembly time; product recycling; Work factor Method(WF);
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a method of disassembly time evaluation for a product has been proposed. The product designer can predict the ability of disassembly for a given product in terms of time by considering a type, size, weight, connection parts, and the movement distance of the product. The equations for calculating disassembly time were derived by applying the basis motion status of worker and some information of connection parts, various tools, and many different type of assembly structures. The developed method of evaluating disassembly time has been applied to disassemble the product by manual labor. The proposed method has shown that the actual disassembly time was well predicted.
引用
收藏
页码:1753 / 1759
页数:7
相关论文
共 50 条
  • [1] Product design method for assembly and disassembly
    Chang, XQ
    Ning, RX
    Yao, J
    Yan, Y
    [J]. PROGRESS OF MACHINING TECHNOLOGY: WITH SOME TOPICS IN ADVANCED MANUFACTURING TECHNOLOGY, 2000, : 795 - 800
  • [2] An intelligent product disassembly planning method
    Wang Hui
    Xiang Dong
    Duan Guanghong
    [J]. PROCEEDINGS OF THE 2006 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2006, : 357 - 357
  • [3] Construction and energy evaluation method for hybrid graph model of product disassembly
    Tian, Guang-Dong
    Chu, Jiang-Wei
    Liu, Yu-Mei
    Li, Zhong-Kai
    Jin, Xiao-Hong
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (12): : 2613 - 2618
  • [4] Comprehensive Evaluation Method for the Product's Disassembly Sequences Based on Information Entropy
    Xue, Junfang
    Zhang, Yingli
    Zhang, Xinjian
    [J]. ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 2789 - 2793
  • [5] A method for estimating the profitability of a product disassembly operation
    Das, SK
    [J]. AMST'99: ADVANCED MANUFACTURING SYSTEMS AND TECHNOLOGY, 1999, (406): : 807 - 814
  • [6] DESIGN FOR DISASSEMBLY METHOD AS SUSTAINABLE PRODUCT EVALUATION TOOL: EXAMPLE OF UNDERGROUND ESCALATOR
    Shetty, Devdas
    Xu, Jiajun
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2017, VOL 11, 2018,
  • [7] A Parallel Disassembly Method for Green Product Design
    Smith, Shana
    Hung, Pei-Yu
    [J]. 2012 ELECTRONICS GOES GREEN 2012+ (EGG), 2012,
  • [8] Product Improvement Design Method facing Modularization Disassembly
    Wang, Weilin
    Zhang, Jiatai
    [J]. MATERIALS SCIENCE AND ENGINEERING APPLICATIONS, PTS 1-3, 2011, 160-162 : 564 - 567
  • [9] Devising a Training Method for Assembly Work by Employing Disassembly
    Ichikizaki, Osamu
    Kubota, Ryou
    Komori, Toshikazu
    Matsumoto, Toshiyuki
    Erikawa, Akihiro
    [J]. INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2013, 12 (04): : 368 - 379
  • [10] The Disassembly Map: A new method to enhance design for product repairability
    De Fazio, Francesco
    Bakker, Conny
    Flipsen, Bas
    Balkenende, Ruud
    [J]. JOURNAL OF CLEANER PRODUCTION, 2021, 320