Mechanical Analysis and Arrangement Study of REJ for CWR on Cable-stayed Bridge

被引:0
|
作者
机构
[1] Cai, Xiao-Pei
[2] Miao, Qian
[3] Li, Da-Cheng
[4] Xu, Juan-Juan
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: Compared with the common railway bridge, the interaction between the bridge and rail on cable-stayed bridge with large span and long beams is more complicated. There is little related research and engineering application of continuous welded rail (CWR) on the long span cable-stayed bridge. Especially, the research on the interaction between structures, mechanical behaviors and optimal arrangement of rail expansion joints (REJ) are relatively inadequate. In this paper, based on the Anqing - Jiujiang Railway Yangtze River Long-span Cable-stayed Bridge, the spatial coupling model of CWR on bridge is established and the design schemes of CWR on the bridge are studied and analyzed. Research conclusions: (1) Due to that temperature span of cable-stayed bridge is large and the REJ is not used, the rail strength and track stability cannot meet the requirements of the standards when the whole bridge is laid with constant and small resistance fasteners. (2) In order to reduce the interaction between the beam and rail, two sets of one-way REJ are arranged at both ends of the main beam. (3) Switch rail of REJ should be arranged on the continuous main beam with constant resistance fasteners. The stock rail is located at the simply supported beam of the side span. Small or constant resistance fasteners can be laid on the stock rail side. (4) The research can be used as reference for design and checking, structural optimization and arrangement of REJ for CWR on cable-stayed bridge. © 2018, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
相关论文
共 50 条
  • [21] Cable-stayed pedestrian bridge
    Fernandez, P
    PCI JOURNAL, 2000, 45 (04): : 119 - 119
  • [22] Mechanical Design of a Cable Climbing Robot for Inspection on a Cable-Stayed Bridge
    Zheng, Zhenliang
    Yuan, Xiaoqiang
    Huang, Huanhui
    Yu, Xiao
    Ding, Ning
    2018 13TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2018, : 1680 - 1684
  • [23] Analysis of the parameter vibrations of the cable in cable-stayed bridge by FEM
    Wei, Jian-dong
    Yang, You-fa
    Che, Hui-min
    Gong Cheng Li Xue/Engineering Mechanics, 2000, 17 (06): : 130 - 134
  • [24] Bifurcation and Chaotic Analysis for Cable Vibration of a Cable-Stayed Bridge
    Gao, Fabao
    Wang, Ruifang
    Lai, S. K.
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2020, 20 (02)
  • [25] Mechanical Performance Analysis and Parametric Study of the Transition Section of a Hybrid Cable-Stayed Suspension Bridge
    Jia, Lijun
    Xu, Jiawei
    Luo, Kedian
    Li, Weihui
    Liu, Yangqing
    Pei, Huiteng
    BUILDINGS, 2024, 14 (06)
  • [26] Mechanical Mechanism Analysis of Longitudinal Cracks Appeared in a Large Cable-stayed Bridge Cable Tower
    Yang, Liang Liang
    Dong, Jun
    He, Jie
    Liang, Tian
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1626 - +
  • [27] Study on the mechanical characteristics of steel truss cable-stayed bridge with water pipeline
    Li, Ranran
    Wang, Xiaoshan
    Zhang, Yajun
    Xue, Yuxin
    6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2021, 647
  • [28] Effect of cable stiffness on a cable-stayed bridge
    Wang, YC
    STRUCTURAL ENGINEERING AND MECHANICS, 1999, 8 (01) : 27 - 38
  • [29] Determination of cable tension on cable-stayed bridge
    Yao, Wen-Bin
    Zhang, Wei
    Shao, Qian-Jun
    Chinese Journal of Sensors and Actuators, 2004, 17 (03) : 484 - 487
  • [30] Influence of Fatigue on Cable Arrangement in Cable-stayed Bridges
    Pipinato, A.
    Pellegrino, C.
    Fregno, G.
    Modena, C.
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2012, 12 (01) : 107 - 123