A novel movable scaffolding system (MSS) for a long-span curved girder bridge

被引:0
|
作者
Chen, Zeng-Shun [1 ,2 ]
Zhou, Jian-Ting [1 ,3 ]
Hu, Gang [2 ]
Li, Yong [4 ]
Ma, Hu [3 ]
Yao, Guo-Wen [1 ,3 ]
机构
[1] State Key Laboratory Breeding Base of Mountain Bridge and Tunnel Engineering, Key Laboratory of Bridge Structure Engineering Transportation Industry (Chongqing), China
[2] Department of Civil and Environmental Engineering, Hong Kong University of Science and Technology, Clear Water Bay, Kowloon, Hong Kong
[3] School of Civil Engineering, Chongqing Jiaotong University, Chongqing, China
[4] Shenzhen Bridge-Doctor Design An D Research Institute Co., Ltd., Shenzhen, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
A movable scaffolding system (MSS) can improve the automation of bridge construction and therefore was widely used. However, for bridges with small radius curves, there are many difficulties when the huge MSS moving from one span to the next. In this paper, a new huge MSS (around 1500 t) for passing span of a curved bridge was designed and presented to complete the erection of the second longest span rail transit cable-stayed bridge in in the world whose north approach bridge features high piers, long spans, and a small radius. Schemes for the MSS passing span of the curved bridge were introduced. The finite element analysis (FEA) and field tests of the MSS when passing span were carried out. The calculative and field measured results were compared and analysed. The comparisons and analyses indicate that the small radius curve of the bridge and uncertainties during the erection have great effect on field measured stresses and displacements of the MSS. The bridge was competed smoothly and efficiently using the MSS with consideration of the calculations and filed measurements.
引用
收藏
页码:164 / 175
相关论文
共 50 条
  • [21] LONG-SPAN PRECAST PRESTRESSED GIRDER BRIDGES
    LIBBY, JR
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1971, 16 (04): : 80 - &
  • [22] Equivalent design of aeroelastic model for a long-span suspension bridge with truss stiffening girder
    Li, Chun-Guang
    Chen, Zheng-Qing
    Zhang, Zhi-Tian
    Zhendong yu Chongji/Journal of Vibration and Shock, 2009, 28 (09): : 171 - 174
  • [23] Dynamic reliability fusion prediction of long-span bridge girder considering structural serviceability
    Fan X.-P.
    Yang G.-H.
    Shang Z.-P.
    Zhao X.-X.
    Xiao Q.-K.
    Liu Y.-F.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (01): : 144 - 153
  • [24] Research on Optimization of Hoisting Sequence of Main Girder of Asymmetric Long-span Suspension Bridge
    Xiong, Shaohui
    Li, Yang
    Fu, Bin
    IOP Conference Series: Earth and Environmental Science, 2021, 638 (01):
  • [25] Numerical Prediction of Aerodynamic Characteristics of a Long-span Truss Girder Bridge under Construction
    Yang, Yan-Hua
    Li, Xin
    Si, Tian-Wen
    Weng, Jian-Cheng
    INTERNATIONAL CONFERENCE ON MECHANICS, BUILDING MATERIAL AND CIVIL ENGINEERING (MBMCE 2015), 2015, : 782 - 787
  • [26] Aerodynamic Optimization of Flutter Stability for a Long-span Streamlined Box Girder Suspension Bridge
    Liu Z.
    Xie P.
    Chen Z.
    Xu G.
    Xu J.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2019, 46 (03): : 1 - 9
  • [27] Analysis of vehicle-bridge coupled vibration of long-span curved truss bridge in service
    Zhou R.-J.
    Wang Y.
    Chen H.
    Zhendong Gongcheng Xuebao/Journal of Vibration Engineering, 2022, 35 (01): : 103 - 112
  • [28] Study of Aerostatic Safety of Long-Span Suspension Bridge in Process of Stiffening Girder Hoisting
    Zhang, Tai-Ke
    Tang, Mao-Lin
    Li, Min-Shi
    Li, Cui-Juan
    Bridge Construction, 2019, 49 (06) : 30 - 35
  • [29] Full aeroelastic model test of a super long-span bridge with slotted box girder
    Sato, H
    Hirahara, N
    Fumoto, K
    Hirano, S
    Kusuhara, S
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2002, 90 (12-15) : 2023 - 2032
  • [30] Calculation of spanwise vortex-induced vibration responses of long-span bridge girder
    Research Center of Wind Eng., Southwest Jiaotong University, Chengdu 610031, China
    Xinan Jiaotong Daxue Xuebao, 2008, 6 (740-746): : 740 - 746