Practical application of bioaugmentation technology during rapid start-up of a sewage treatment plant

被引:0
|
作者
Zhao, Li-Jun [1 ]
Ma, Fang [1 ]
Zhao, Qing-Jian [1 ]
Gao, Min [1 ]
机构
[1] School of Municipal and Environmental Engineering, Harbin Institute of Technology, Harbin 150090, China
关键词
Bacteria - Cell culture - Sewage treatment plants;
D O I
暂无
中图分类号
学科分类号
摘要
In order to achieve rapid start-up of a wastewater treatment plant under low temperature, a practical application study on bioaugmentation technology was carried out at Harbin, Tai Ping sewage treatment plant for the first time. The results showed that co-addition of activated bacterium solution, bio-preparation together with bio-sludge and multiple culture of bacterium under ambient temperature of 10°C and sewage temperature of 14°C had efficiently overcome the negative effects of low temperature, low loading, poor nutrition and sewage quantity fluctuation etc. After treatment, the average concentration of COD, NH4+-N and SS were decreased from 210 mg/L, 37.4 mg/L and 218 mg/L to 44 mg/L, 2.3 mg/L and 16.6 mg/L respectively, the effluent quality preceded the design parameters. Therefore, the engineering application of bioaugmentation technology during rapid start-up of a sewage treatment plant under low temperature was successful and worthy of popularization.
引用
收藏
页码:1886 / 1889
相关论文
共 50 条
  • [1] Application of bioaugmentation in the rapid start-up and stable operation of biological processes for municipal wastewater treatment at low temperatures
    Guo, Jingbo
    Wang, Jihua
    Cui, Di
    Wang, Li
    Ma, Fang
    Chang, Chein-Chi
    Yang, Jixian
    BIORESOURCE TECHNOLOGY, 2010, 101 (17) : 6622 - 6629
  • [2] WAGE INCENTIVE PLANT WITH START-UP APPLICATION
    AGHI, BM
    RARDEN, LJ
    WESTERN ELECTRIC ENGINEER, 1974, 18 (01): : 10 - 16
  • [3] Plant start-up
    不详
    NUCLEAR PLANT JOURNAL, 1996, 14 (02) : 6 - 6
  • [4] Technology start-up
    Dutton, Terry
    Quality World, 2002, 28 (03):
  • [5] Start-up of Biogas Plant with Inoculating Sludge Application
    Kogut, Pawel
    Piekarski, Jacek
    Ignatowicz, Katarzyna
    ROCZNIK OCHRONA SRODOWISKA, 2014, 16 : 534 - 545
  • [6] Modeling of transient states in the start-up path during voltage and start-up power application
    Grzadzielski, Ireneusz
    Olejnik, Bartosz
    Zakrzewski, Mikolaj
    ARCHIVES OF ELECTRICAL ENGINEERING, 2019, 68 (04) : 749 - 769
  • [7] Sulfur plant start-up
    Hudson, Hank
    Grigson, Susan
    Hydrocarbon Engineering, 2002, 7 (02):
  • [8] OPERATION CHARACTERISTICS RESEARCH OF URBAN SEWAGE TREATMENT DURING THE START-UP PROCESS IN CONSTRUCTED WETLANDS
    Gao, Haiying
    Wang, Shihe
    Liang, Zhishui
    Deng, Lin
    FRESENIUS ENVIRONMENTAL BULLETIN, 2013, 22 (02): : 388 - 394
  • [9] EQUIPMENT PLANT START-UP
    MARPLE, DD
    WATER-ENGINEERING & MANAGEMENT, 1981, : 31 - 32
  • [10] Optimization of nitrogen removal and start-up of Psyttalia sewage treatment works
    Mamais, D.
    Noutsopoulos, C.
    Andreadakis, A.
    Droubogianni, J.
    Georgakopoulos, A.
    Tsepapadakis, E.
    Mariolos, J.
    ENVIRONMENTAL TECHNOLOGY, 2007, 28 (02) : 129 - 136