共 50 条
- [21] Role of outlet works in management and control of floods DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 223 - 230
- [22] DMAIC Method of Quality Improvement of Ground Works Processes: Case Study WORLD MULTIDISCIPLINARY EARTH SCIENCES SYMPOSIUM (WMESS 2018), 2019, 221
- [23] Quality Management in Construction V. Problems with the Quality of the Works and their Causes QUALITY-ACCESS TO SUCCESS, 2013, 14 (136): : 76 - 78
- [24] Ground water quality and land-use management models for nonpoint source pollution control Iranian Journal of Science & Technology, 1998, 22 (02): : 151 - 168
- [25] Ground water quality and land-use management models for nonpoint source pollution control IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 1998, 22 (02): : 151 - 168
- [26] Design on excavation and support of underground works for the conveyance system in the Three Gorges Project permanent shiplock Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 696 - 699
- [27] RISK MANAGEMENT FOR GROUND ENGINEERING WORKS: THE ROLE OF THE INDEPENDENT MONITORING CONSULTANT ADVANCES IN UNDERGROUND SPACE DEVELOPMENT, 2013, : 1129 - 1135
- [28] Blasting works quality management in accordance with environmental conditions PROCEEDINGS OF THE TWENTY-EIGHTH ANNUAL CONFERENCE ON EXPLOSIVES AND BLASTING TECHNIQUE, VOL II, 2002, : 371 - 378
- [29] On concrete construction technology of shiplock's thin lining wall Renmin Changjiang/Yangtze River, 2001, 32 (08): : 37 - 38