共 50 条
- [2] Concrete placing construction of shiplock's ground works Renmin Changjiang/Yangtze River, 2001, 32 (08): : 34 - 36
- [3] Foundation pit excavation and anchoring construction procedure of shiplock's vertical wall 2001, Yangtze River Scientific Research Institute (32):
- [4] Unilateral slipform design and construction of the chamber's lining wall Renmin Changjiang/Yangtze River, 2001, 32 (08): : 39 - 40
- [6] Temperature control study on lining concrete of conveyance tunnel of permanent shiplock at Three Gorges project Wuhan Daxue Xuebao (Gongxue Ban)/Engineering Journal of Wuhan University, 2001, 34 (03):
- [7] Extruded concrete lining - The future lining technology for industrialized tunneling Proceedings - Rapid Excavation and Tunneling Conference, 2001, : 679 - 685
- [8] Study on the construction of concrete cut-off wall and the detection technology Shuili Fadian/Water Power, (03): : 32 - 35
- [9] Application and effect of new technology in lining concrete construction for long-life of mountain tunnels LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 629 - 636
- [10] Analysis on Construction Technology of Concrete Cutoff Wall in Water Conservancy and Hydropower Project INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2017, : 59 - 62