On concrete construction technology of shiplock's thin lining wall

被引:0
|
作者
Ma, Y.
机构
来源
Renmin Changjiang/Yangtze River | 2001年 / 32卷 / 08期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:37 / 38
相关论文
共 50 条
  • [41] The Development of Sprayed Concrete and Construction Technology Research
    Wang, Ruyi
    Hou, Ziyi
    Wang, Jiliang
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION, 2015, 41 : 485 - 492
  • [42] STRUCTURE AND CONSTRUCTION TECHNOLOGY OF A SINGLE-SHELL TUNNEL LINING OF PRECAST REINFORCED-CONCRETE ELEMENTS, SEALED AGAINST GROUNDWATER PRESSURE
    MULLER, M
    BALOGH, J
    TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 253 - 257
  • [43] Construction technology of durable concrete in Permafrost district
    Du, B
    Yi, QX
    ENVIRONMENTAL ECOLOGY AND TECHNOLOGY OF CONCRETE, 2006, 302-303 : 197 - 202
  • [44] Low cement concrete technology for sustainable construction
    Gupta, Rajesh
    Goyal, J.K.
    Das, Shankh
    Tiwari, Devesh
    Indian Concrete Journal, 2010, 84 (11): : 32 - 39
  • [45] Influence of construction technology on the adhesion of remedial concrete
    Mavar, Krunoslav
    Skazlic, Marijan
    GRADEVINAR, 2012, 64 (07): : 545 - 552
  • [46] Chinese experience on plastic membrane-concrete thin slab lining for canals
    Water Conservancy and Hydroelectric, Power Bur, Changsha City, China
    Irrig Drain Syst, 1 (77-94):
  • [47] Construction technology and management of aerated concrete block filler walls in short-leg shear wall structure
    Xu, Tinghua
    Qu, Weizhong
    Liang, Zhenhui
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2006, 27 (SUPPL.): : 688 - 691
  • [48] Selection of Wall Rock Thickness for Thermal Stress Analysis of Circular Tunnel Concrete Lining
    Dong, Fupin
    Dong, Yang
    JOURNAL OF ENGINEERING MECHANICS, 2013, 139 (07) : 916 - 919
  • [49] Dual use of a secant bored pile wall at the new lock of Dorverden: construction pit lining and chamber wall
    Saathoff, Joachim
    Kauther, Regina
    Mueller, Hilmar
    Herten, Markus
    BETON- UND STAHLBETONBAU, 2013, 108 (04) : 276 - 281
  • [50] Excavation and anchoring treatment on f1096 fault at TGP's shiplock construction site
    Wu, Xiao-Long
    Renmin Changjiang/Yangtze River, 2003, 34 (09):