Beam extraction by the Laser Charge Exchange method using the 3-MeV LINAC in J-PARC

被引:0
|
作者
Takei H. [1 ]
Hirano K. [1 ]
Tsutsumi K. [2 ]
Meigo S.-I. [1 ]
机构
[1] J-PARC Center, Japan Atomic Energy Agency, Tokai, Ibaraki
[2] Nippon Advanced Technology Co., Ltd., Tokai, Ibaraki
关键词
3-MeV linac; Accelerator-Driven System (ADS); Beam extraction; Japan Proton Accelerator Research Complex (J-PARC); Laser charge exchange method; Transmutation Experimental Facility (TEF);
D O I
10.1585/PFR.13.2406012
中图分类号
学科分类号
摘要
The Accelerator-driven System (ADS) is one of the candidates for transmuting long-lived nuclides, such as minor actinide (MA), produced by nuclear reactors. For the efficient transmutation of MA, a precise prediction of the neutronics of the ADS is required. To obtain neutronics data for the ADS, the Japan Proton Accelerator Research Complex (J-PARC) has a plan to build the Transmutation Physics Experimental Facility (TEF-P), in which a 400-MeV positive proton (H+) beam will be delivered from the J-PARC linac. Because the TEF-P requires a stable and low background proton beam with a power of less than 10W, a stable and meticulous beam extraction method is required to extract the low power proton beam from the high power negative hydrogen (H-) beam of 250 kW. To fulfill this requirement, a new type of Laser Charge Exchange (LCE) device was developed. A feature of this LCE device is the elimination of the background protons that are not extracted by the LCE technique. To demonstrate the charge exchange of H-, an LCE experiment was conducted using a linac with an energy of 3MeV in J-PARC. As a result of the experiment, a charge-exchanged H+ beam with a power of 7.99 ± 0.22Wequivalent was obtained under the J-PARC linac beam condition, and this value nearly satisfied the power requirement of the proton beam for the TEF-P. © 2019 The Japan Society of Plasma.
引用
收藏
相关论文
共 50 条
  • [31] Non-destructive 2-D beam profile monitor using gas sheet in J-PARC LINAC
    Kamiya, J.
    Ogiwara, N.
    Miura, A.
    Kinsho, M.
    Hikichi, Y.
    9TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC18), 2018, 1067
  • [32] Low-power proton beam extraction by the bright continuous laser using the 3-MeV negative-hydrogen linac in Japan Proton Accelerator Research Complex
    Takei, Hayanori
    Tsutsumi, Kazuyoshi
    Meigo, Shin-Ichiro
    JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2021, 58 (05) : 588 - 603
  • [33] Iterative learning control-based adaptive beam loading compensation implementations in the J-PARC LINAC
    Li, S.
    Fang, Z.
    Futatsukawa, K.
    Qiu, F.
    Fukui, Y.
    Shinozaki, S.
    Sato, Y.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2019, 945
  • [34] Beam dynamics design of the L3BT for J-PARC
    Ohkawa, T
    Ikegami, M
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3060 - 3062
  • [35] Beam Optics Design of Stretcher Ring and Transfer Line for J-PARC Slow Extraction
    Tomizawa, Masahito
    Konaka, Akira
    Muto, Ryotaro
    Ogitsu, Toru
    9TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC18), 2018, 1067
  • [36] Slow extraction from the J-PARC main ring using a dynamic bump
    Tomizawa, M.
    Arakaki, Y.
    Kimura, T.
    Muto, R.
    Murasugi, S.
    Okamura, K.
    Sato, H.
    Shirakabe, Y.
    Yanaoka, E.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2018, 902 : 51 - 61
  • [37] J-PARC muon science facility with use of 3 GeV proton beam
    Miyake, Y
    Kawamura, N
    Makimura, S
    Strasser, P
    Shimomura, K
    Nishiyama, K
    Beveridge, JL
    Kadono, R
    Sato, N
    Fukuchi, K
    Nagamine, K
    Higemoto, W
    Ishida, K
    Matsuzaki, T
    Watanabe, I
    Matsuda, Y
    Iwasaki, M
    Nakamura, SN
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2005, 149 : 393 - 395
  • [38] Simulation study on the slow extraction for the improvement of the beam shill structure at J-PARC Main Ring
    Muto, R.
    Kimura, T.
    Murasugi, S.
    Okamura, K.
    Shirakabe, Y.
    Tomizawa, M.
    Yanaoka, E.
    Numai, K.
    Matsumura, A.
    IPAC23 PROCEEDINGS, 2024, 2687
  • [39] Monte carlo calculations for the shielding design of beam injection and extraction areas at the 3-GeV synchrotron in J-PARC
    Japan Atomic Energy Agency, Tokai-mura, Ibaraki 319-1195, Japan
    不详
    Nucl Technol, 2 (519-523):
  • [40] MONTE CARLO CALCULATIONS FOR THE SHIELDING DESIGN OF BEAM INJECTION AND EXTRACTION AREAS AT THE 3-GeV SYNCHROTRON IN J-PARC
    Nakane, Yoshihiro
    Abe, Teruo
    Nakashima, Hiroshi
    NUCLEAR TECHNOLOGY, 2009, 168 (02) : 519 - 523