共 50 条
- [1] Current status of slow extraction from J-PARC Main Ring 10TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE, 2019, 1350
- [2] design of dynamic collimator for J-PARC main ring 2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2726 - 2728
- [3] Simulation study on the slow extraction for the improvement of the beam shill structure at J-PARC Main Ring IPAC23 PROCEEDINGS, 2024, 2687
- [5] The fast extraction kicker power supply for the main ring of J-PARC NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2013, 729 : 3 - 7
- [6] Status of J-PARC main ring synchrotron 2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2589 - 2591
- [8] Beam diagnostics for the J-PARC Main Ring synchrotron 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 1776 - 1778
- [9] Electron cloud simulations for the main ring of J-PARC 8TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC 2017), 2017, 874
- [10] Beam Optics Design of Stretcher Ring and Transfer Line for J-PARC Slow Extraction 9TH INTERNATIONAL PARTICLE ACCELERATOR CONFERENCE (IPAC18), 2018, 1067