Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [31] Vibrations during TBM excavation. Details and analyses of real cases
    Lunardi, Giuseppe
    Mancinelli, Luca
    Nardone, Chiara
    Panzer, Paolo
    Casari, Stefano
    GALLERIE E GRANDI OPERE SOTTERRANEE, 2015, (114): : 27 - 39
  • [32] Experimental Study of Local Scour of Super-Large Caisson Foundation under Pre-excavation of Riverbed
    Yang, Cheng-Sheng
    Yu, Zhu-Qing
    Xia, Peng-Fei
    Gao, Zheng-Rong
    Gao, Xiang-Yu
    Bridge Construction, 2022, 52 (01) : 72 - 79
  • [33] Consolidation grouting using horizontal directional drilling technology in the Praga district of Warsaw prior to TBM tunnelling
    Barbanti, Marco
    Bonanno, Marco
    Rigazio, Andrea
    Geomechanik und Tunnelbau, 2014, 7 (03): : 248 - 254
  • [34] Effect of Pre-excavation Construction on Surrounding Historic Building Based on Field Measurements in Shanghai Soft Ground
    Li, Hang
    Liao, Shao-ming
    Tang, Yong-jing
    Shen, Mingliang
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: ADVANCES IN SOIL DYNAMICS AND FOUNDATION ENGINEERING, 2018, : 447 - 454
  • [35] Effects of water related factors on pre-grouting in hard rock tunnelling
    Mao, Dawei
    Lu, Ming
    Zhao, Zhiye
    Ng, Melvin
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 300 - 307
  • [36] Pre-grouting and chemical injection for preserving groundwater environment and safe tunnelling
    Date, K.
    Narita, N.
    Yokota, Y.
    Takuji, Y.
    Sakamaki, S.
    Kashiwaya, M.
    Kobayashi, S.
    Chiba, T.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1603 - 1610
  • [37] Calculation model of unlimited earth pressure on both sides of enclosure wall during pre-excavation dewatering
    Xue Xiu-Li
    Liu Zhi-Heng
    Zeng Chao-Feng
    Bai Ning
    Chen Hong-Bo
    ROCK AND SOIL MECHANICS, 2024, 45 (06) : 1699 - 1708
  • [38] Pre-treatment of ground in hard rock TBM tunneling: probe drilling and pre-grouting
    Log, S.
    Ofiara, D.
    Bruland, A.
    Jakobsen, P.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1289 - 1296
  • [39] Challenging TBM tunnelling at Abdalajis
    Weber, Wolfgang
    Daoud, Hadi
    Fernandez, Enrique
    Tunnels and Tunnelling International, 2005, 37 (05): : 36 - 38
  • [40] Abrasivity of soils in TBM tunnelling
    Tunnels and Tunnelling International, 2006, 38 (03): : 36 - 38