Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [21] Construction Techniques of Horizontal Ground Freezing Pre-excavation Support of Gongbei Port Tunnel
    Liu, Yingliang
    Zhang, Jie
    Pan, Jianli
    Gao, Haidong
    2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015, 2015, : 183 - 189
  • [22] Failure Analysis of a Pre-Excavation Double Equipment Withdrawal Channel and Its Control Techniques
    Li, Chen
    Guo, Xiaofei
    Lian, Xiaoyong
    Ma, Nianjie
    ENERGIES, 2020, 13 (23)
  • [23] Pre-grouting and tunnel excavation of watertight structure section
    Saito, H.
    Date, K.
    Narita, N.
    Yamamoto, T.
    Yokota, Y.
    Koizumi, Y.
    ISRM International Symposium - 8th Asian Rock Mechanics Symposium, ARMS 2014, 2014, : 1184 - 1189
  • [25] DC-resistivity mapping of internal landfill structures: two pre-excavation surveys
    Bernstone, C
    Dahlin, T
    Ohlsson, T
    Hogland, W
    ENVIRONMENTAL GEOLOGY, 2000, 39 (3-4): : 360 - 371
  • [26] DC-resistivity mapping of internal landfill structures: two pre-excavation surveys
    Bernstone, C.
    Dahlin, T.
    Ohlsson, T.
    Hogland, W.
    Environmental Geology, 2000, 39 (03): : 360 - 371
  • [27] Bored tunnelling - TBM and shield tunnelling
    Akagi, H
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2000, : 33 - 38
  • [28] Grouting technology in tunnelling
    Injektionstechnik im tunnelbau
    Kogler, K. (Kurt.Kogler@zueblin.at), 1600, Ernst und Sohn (06):
  • [29] Behaviours of wall and soil during pre-excavation dewatering under different foundation pit widths
    Zeng, Chao-Feng
    Zheng, Gang
    Zhou, Xiao-Feng
    Xue, Xiu-Li
    Zhou, Hai-Zuo
    COMPUTERS AND GEOTECHNICS, 2019, 115
  • [30] Characteristics of ground deformation induced by pre-excavation dewatering considering blocking effect of adjacent structure
    Zeng C.-F.
    Wang S.
    Yuan Z.-C.
    Xue X.-L.
    1600, Zhejiang University (55): : 338 - 347