Analyses of Pre-Excavation Grouting for TBM Tunnelling

被引:0
|
作者
Wannenmacher H. [1 ]
Schlicke M. [2 ]
机构
[1] Implenia Österreich GmbH., Tunnelling & Civil Engineering, Innsbrucker Bundesstraße 67, Salzburg
[2] Technical University of Munich, Chair of Construction Process Management, Arcisstrasse 21, München
来源
Geomechanik und Tunnelbau | 2023年 / 16卷 / 01期
关键词
Grouting; Mechanized tunneling; Pre-Excavation Grouting; Sealing; TBM; Tunnel; Unlined Tunnels; Utility tunnels; Water Inflow;
D O I
10.1002/geot.202200069
中图分类号
学科分类号
摘要
Pre-excavation grouting (PEG) is essential for mitigating groundwater inflow to unlined tunnel structures. Prevention of initial water inflow proved best practice to balance groundwater conditions throughout the utilisation of a tunnel. The grouted rock mass acts as a circumferential sealing barrier instead of a secondary lining to minimise groundwater inflow to an acceptable level over the structure's lifetime. The construction of unlined tunnels relies on existing favourable in-situ rock mass conditions with an overall low hydraulic head, mainly to keep the effort of grouting inferior and avoid an unbalanced proportion of pre-excavation grouting during the tunnel construction works. From the operational perspective of tunnelling works, pre-excavation grouting delineates the continuous excavation process of a TBM and represents a discontinuative work process. In addition, grouting includes an exploration process ahead of the cutterhead to predict the ground conditions to align the sealing demand of the rock mass. Generally, pre-excavation grouting foresees the drilling of mainly open boreholes with a considerable length of 20 m to 25 m ahead of the tunnel boring machine (TBM). Establishing a continuous grouted zone around the tunnel demands an overlapping of the grouting rings ranging from 2 m to 10 m. The overlapping decreases the excavation length of the TBM adequately. The repetitive grouting process interfering with the excavation consists of various processes such as exploration including water loss measuring (WLM), the drilling and grouting of boreholes and the hardening time. TBM tunnelling depends on the systematic and continuous implementation of construction procedures. Therefore, based on current static pre-excavation grouting, an agile combined grouting and excavation approach is presented, incorporating a reliable pre-excavation grouting, a systematic TBM excavation and a specific balance of long-term sealing and high utilisation rates for TBM excavation. © 2023, Ernst und Sohn. All rights reserved.
引用
收藏
页码:55 / 59
页数:4
相关论文
共 50 条
  • [1] Pre-excavation grouting in rock tunneling – Dealing with high groundwater pressures
    Hognestad H.-O.
    Kieffer S.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 141 - 146
  • [2] Lake Mead-Intake Tunnel No. 3 Pre-Excavation Grouting Challenges Using a High Pressure Slurry TBM
    Cimiotti, Claudio
    Bono, Roberto
    Fioravanti, Pietro
    GROUTING 2017: CASE HISTORIES, 2017, (287): : 325 - 337
  • [3] Neelum Jhelum Hydroelectric Project: Pre-Excavation Grouting in Twin Headrace Tunnels
    Kizilbash, Masrour H.
    Dickson, Peter A.
    Jaffery, Nasir A.
    GROUTING 2017: CASE HISTORIES, 2017, (287): : 238 - 248
  • [4] Pre-excavation Grouting to Prevent Water Inflow of Jointed Rock in Underground Construction
    Liu R.
    Zheng Z.
    Li S.
    Zhang Q.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2019, 54 (01): : 48 - 54
  • [5] The Stockholm Bypass – Design and execution of grouting works: Pre-excavation grouting by means of rock fissure grouting with cementitious grouts
    Creütz M.
    Osterman F.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 147 - 157
  • [6] Pre-conditioning/pre-excavation grouting of the soils prior to tunneling below highways and railways: Case histories from the past decade
    Naudts, Alex
    Naudts, Ward
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 120 - 128
  • [7] Pre-excavation drilling and grouting for water control and ground improvement in highly variable ground conditions at the Arrowhead Tunnels Project
    Fulcher, Brian
    Bell, Michael
    Garshol, Knut
    NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 749 - +
  • [8] Compensation grouting for TBM tunnelling beneath shallow-cover
    Chiriotti, E.
    Avagnina, N.
    Grasso, R.
    Tripoli, G.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2006, : 377 - +
  • [9] ANTIPOLIS IN SOUTHERN-FRANCE - PRE-EXCAVATION INVESTIGATIONS, 1973
    SCHODER, RV
    OIKONOMI.AN
    AMERICAN JOURNAL OF ARCHAEOLOGY, 1974, 78 (02) : 177 - 178
  • [10] Countermeasures to Retaining Wall Deflection Induced by Pre-excavation Dewatering
    Zeng, Chao-Feng
    Yuan, Zhi-Cheng
    Xue, Xiu-Li
    Zheng, Gang
    Mei, Guo-Xiong
    PROCEEDINGS OF GEOSHANGHAI 2018 INTERNATIONAL CONFERENCE: ADVANCES IN SOIL DYNAMICS AND FOUNDATION ENGINEERING, 2018, : 455 - 463