Intelligent optimization under blocking constraints: A novel iterated greedy algorithm for the hybrid flow shop group scheduling problem

被引:0
|
作者
Qin, Haoxiang [1 ]
Han, Yuyan [1 ]
Wang, Yuting [1 ]
Liu, Yiping [2 ]
Li, Junqing [1 ,3 ]
Pan, Quanke [4 ]
机构
[1] School of Computer Science, Liaocheng University, Liaocheng,252059, China
[2] The College of Computer Science and Electronic Engineering, Hunan University, 410082, China
[3] School of Computer Science, Shandong Normal University, Jinan,250014, China
[4] School of Mechatronic Engineering and Automation, Shanghai University, Shanghai,200072, China
来源
Knowledge-Based Systems | 2022年 / 258卷
关键词
Compilation and indexing terms; Copyright 2024 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Combinatorial optimization - Machine shop practice
引用
收藏
相关论文
共 50 条
  • [41] Greedy Algorithm Solution of Flexible Flow Shop Scheduling Problem
    Li, Xiaofeng
    Zhao, Hai
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (11): : 177 - 180
  • [42] A collaborative iterated greedy algorithm with reinforcement learning for energy-aware distributed blocking flow-shop scheduling
    Bao, Haizhu
    Pan, Quanke
    Ruiz, Ruben
    Gao, Liang
    SWARM AND EVOLUTIONARY COMPUTATION, 2023, 83
  • [43] AN INTELLIGENT OPTIMIZATION ALGORITHM FOR BLOCKING FLOW-SHOP SCHEDULING BASED ON DIFFERENTIAL EVOLUTION
    Xu, L. Z.
    Xie, Q. S.
    Yuan, Q. N.
    Huang, H. S.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (04) : 678 - 688
  • [44] A Hybrid Iterated Greedy Algorithm for a Crane Transportation Flexible Job Shop Problem
    Li, Jun-Qing
    Du, Yu
    Gao, Kai-Zhou
    Duan, Pei-Yong
    Gong, Dun-Wei
    Pan, Quan-Ke
    Suganthan, P. N.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 2153 - 2170
  • [45] An improved iterated greedy algorithm for the distributed hybrid flowshop scheduling problem
    Lu, Chao
    Zheng, Jun
    Yin, Lvjiang
    Wang, Renyi
    ENGINEERING OPTIMIZATION, 2024, 56 (05) : 792 - 810
  • [46] A modified iterated greedy algorithm for distributed flowshop group scheduling problem
    Wang, Yuhang
    Han, Yuyan
    Zhang, Chenyao
    Li, Chengshuai
    Wang, Yong
    2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 7 - 12
  • [47] A hybrid algorithm for flow shop scheduling problem
    Zhang, Changsheng
    Sun, Jigui
    Ning, Jiaxu
    Yang, Qingyun
    2008 PROCEEDINGS OF INFORMATION TECHNOLOGY AND ENVIRONMENTAL SYSTEM SCIENCES: ITESS 2008, VOL 1, 2008, : 182 - 188
  • [48] A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem
    Yang, Zhi
    Liu, Cungen
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (03):
  • [49] Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags
    Ning ZHAO
    Song YE
    Kaidian LI
    Siyu CHEN
    Chinese Journal of Mechanical Engineering, 2017, 30 (03) : 652 - 662
  • [50] Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags
    Ning ZHAO
    Song YE
    Kaidian LI
    Siyu CHEN
    Chinese Journal of Mechanical Engineering, 2017, 30 : 652 - 662