共 50 条
- [21] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 3, CSCE 2022, 2024, 359 : 229 - 238
- [24] Design and Construction of Temporary Works to Facilitate the Construction of Go Rail Tunnel Under the Highway 401 and 409 PROCEEDINGS OF THE CANADIAN SOCIETY OF CIVIL ENGINEERING ANNUAL CONFERENCE 2022, VOL 4, CSCE 2022, 2024, 367 : 229 - 238
- [28] Design and construction components of tunnel rehabilitation NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 457 - 464
- [30] Design and construction of tunnel and shaft plugs NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 334 - 344