An order scheduling problem in seru production system considering worker assignment

被引:0
|
作者
Wang Y. [1 ]
Zhang Z. [1 ]
Yin Y. [2 ]
机构
[1] School of Economics and Management, Nanjing University of Science and Technology, Nanjing
[2] Graduate School of Business, Doshisha University, Karasuma-Imadegawa, Kamigyo-ku, Kyoto
来源
Zhang, Zhe (zhangzhe@njust.edu.cn) | 1600年 / Inderscience Publishers卷 / 37期
基金
中国国家自然科学基金;
关键词
Artificial bee colony algorithm; K-means clustering; KMC; Order scheduling problem; Seru; Worker assignment;
D O I
10.1504/IJISE.2021.112898
中图分类号
学科分类号
摘要
As one of the latest production modes, seru production, which is arising from Japanese manufacturing practice, has been attracted more and more attention due to its efficiency, flexibility, and quick response ability. In this paper, the scheduling problem with worker assignment in the seru production system is studied where a set of orders must be scheduled over the parallel serus according to the due date. This problem is constructed as a multi-objective model to minimise the total variable cost (TVC) and total idle time (TIT). Then, according to the characteristics of proposed model, the K-means clustering is used to solve the worker assignment and the artificial bee colony (ABC) algorithm is used to solve the order scheduling problem. Finally, the practicality and effectiveness of the proposed model and algorithm are demonstrated by the numerical examples, and the results show that the artificial bee colony algorithm has a good scalability. Copyright © 2021 Inderscience Enterprises Ltd.
引用
收藏
页码:149 / 167
页数:18
相关论文
共 50 条
  • [21] Reinforcement Learning Driven Cross-Trained Worker Assignment Approach Based on Big Models: A Study for A Hybrid Seru Production System Considering Learning Effect
    Li, Taixin
    Ye, Chenxi
    Wu, Lang
    Liu, Feng
    Yu, Chengxiao
    Computational Intelligence, 2025, 41 (02)
  • [22] Seru scheduling problem with lot streaming and worker transfers: A multi-objective approach
    Yilmaz, Beren Gursoy
    Yilmaz, Omer Faruk
    Akcali, Elif
    Cevikcan, Emre
    COMPUTERS & OPERATIONS RESEARCH, 2025, 177
  • [23] Bi-objective energy-efficient scheduling in a seru production system considering reconfiguration of serus
    Lian, Jie
    Li, Wenjuan
    Pu, Guoli
    Zhang, Pengwei
    SUSTAINABLE COMPUTING-INFORMATICS & SYSTEMS, 2023, 39
  • [24] Distributed assembly shop scheduling problem for complex products considering multiskilled worker assignment and transportation time
    Gao, Qinglin
    Hu, Hanlin
    Liu, Jianhua
    Zhuang, Cunbo
    Ding, Hongyan
    Li, Huiting
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [25] Considering Product Life Cycle Stages and Worker Skill Level in Seru Production Systems
    Suer, Gursel
    Ulutas, Berna
    Kaku, Ikou
    Yin, Yong
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1097 - 1103
  • [26] Seru Loading with Worker-Operation Assignment in Single Period
    Luo, L.
    Zhang, Z.
    Yin, Y.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1055 - 1058
  • [27] A bi-objective approach for the multi-skilled worker assignment of a hybrid assembly line-seru production system
    Wu, Yinghui
    Zeng, Shaoyu
    Li, Bingbing
    Yu, Yang
    RAIRO-OPERATIONS RESEARCH, 2024, 58 (02) : 1187 - 1206
  • [28] A reinforcement learning-driven adaptive decomposition algorithm for multi-objective hybrid seru system scheduling considering worker transfer
    Wu, Yuting
    Wang, Ling
    Li, Rui
    Chen, Jing-fang
    SWARM AND EVOLUTIONARY COMPUTATION, 2024, 88
  • [29] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Seyed Hessameddin Zegordi
    Mohammad Ali Beheshti Nia
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 928 - 939
  • [30] Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    Zegordi, Seyed Hessameddin
    Nia, Mohammad Ali Beheshti
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10): : 928 - 939