Study on deformation mechanism and roof pre-splitting control technology of gob-side entry in thick hard main roof full-mechanized longwall caving panel

被引:1
|
作者
Wang, Hao-sen [1 ,2 ,3 ,5 ]
He, Man-chao [1 ]
Wang, Jiong [1 ]
Yang, Gang [1 ,2 ]
Ma, Zi-min [1 ,4 ]
Ming, Can [1 ,2 ]
Wang, Rui [5 ]
Feng, Zeng-chao [1 ,2 ]
Zhang, Wen-jie [1 ,2 ]
机构
[1] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[3] Univ British Columbia, NBK Inst Min Engn, Vancouver, BC V6T 1Z4, Canada
[4] Shandong Univ Technol, Sch Resource & Environm Engn, Zibo 255000, Peoples R China
[5] Xinjiang Inst Engn, Min Engn & Geol Coll, Urumqi 830023, Peoples R China
基金
中国国家自然科学基金;
关键词
deformation mechanism; hard roof; gob-side entry; cantilever beam; roof pre-splitting; COAL PILLAR; STABILITY; ROCK; EXCAVATION; PREDICTION; MODELS;
D O I
10.1007/s11771-024-5719-z
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel (LTCC). The investigation utilizes a comprehensive approach that integrates field monitoring, theoretical analysis, and numerical simulation. Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof (LCBM) above the roadway on the stability of the gob-side entry behind the panel. Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar, developed cracks around the roadway, and more pronounced damage to the roadway. Moreover, numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof. This technology significantly reduces the length of the LCBM, thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry. Therefore, this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation, and automatically retain the entry within a hard roof LTCC panel. Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.
引用
收藏
页码:3206 / 3224
页数:19
相关论文
共 50 条
  • [21] An Innovative Approach for Gob-Side Entry Retaining by Roof Cutting in Steeply Pitching Seam Longwall Mining with Hard Roof: a Case Study
    Li Zhang
    Jing Zhao
    Chuanwei Zang
    Shuanlin Wang
    Mining, Metallurgy & Exploration, 2020, 37 : 1079 - 1091
  • [22] Roof deformation mechanism and control measures of pillarless mining with gob-side entry retaining by roof cutting and pressure relief
    Yang Jun
    Wei Qing-long
    Wang Ya-jun
    Gao Yu-bing
    Hou Shi-lin
    Qiao Bo-wen
    ROCK AND SOIL MECHANICS, 2020, 41 (03) : 989 - 998
  • [23] Research on roof damage mechanism and control technology of gob-side entry retaining under close distance gob
    Liu, Hongyang
    Zhang, Boyang
    Li, Xuelong
    Liu, Chengwei
    Wang, Chen
    Wang, Feng
    Chen, Deyou
    ENGINEERING FAILURE ANALYSIS, 2022, 138
  • [24] Experiment research on the control method of automatically retained entry by roof cutting pressure relief within thick hard main roof longwall top coal caving panel
    Wang, Haosen
    Jiang, Jian
    Wang, Jiong
    Liu, Peng
    Wang, Rui
    Wang, Jian
    Hou, Shilin
    He, Manchao
    Ma, Lei
    ENGINEERING FAILURE ANALYSIS, 2025, 168
  • [25] Mechanism and Control Methods of Roof Deformations in Gob-Side Entry Retention by Roof Cutting Under Medium-Thick Coal Seams
    Yang, Xiaojie
    Mao, Wenbin
    Wang, Eryu
    Sun, Yue
    Wang, Jiamin
    He, Manchao
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (01) : 265 - 282
  • [26] Mechanism and Control Methods of Roof Deformations in Gob-Side Entry Retention by Roof Cutting Under Medium-Thick Coal Seams
    Xiaojie Yang
    Wenbin Mao
    Eryu Wang
    Yue Sun
    Jiamin Wang
    Manchao He
    Geotechnical and Geological Engineering, 2020, 38 : 265 - 282
  • [27] Application of Presplitting Blasting Technology in Surrounding Rock Control of Gob-Side Entry Retaining with Hard Roof: A Case Study
    Gong, Shuang
    Tan, Yi
    Liu, Yunpeng
    Zhu, Dan
    Yu, Yang
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2021, 2021
  • [28] Study on Stability Control of Gob-Side Entry Retaining Structure Without Filling Wall in Hard Roof
    Jing-kui, Long
    Chao-xin, Qi
    Zuo-yong, Cao
    Hong, Lan
    Wen-kai, Yu
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [29] Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine
    Liu, Xiao
    He, Xueqiu
    Liang, Yuntao
    Hua, Xinzhu
    Li, Chen
    ENERGY EXPLORATION & EXPLOITATION, 2025, 43 (01) : 47 - 64
  • [30] Research on the mechanism and control of roof deformation in gob-side entry retaining of close-distance coal seams
    Geng, Dongyue
    Fan, Lijun
    Du, Yiteng
    Zhu, Qingwen
    Li, Tingchun
    Zhao, Jingwei
    ENGINEERING FAILURE ANALYSIS, 2024, 164