Study on deformation mechanism and roof pre-splitting control technology of gob-side entry in thick hard main roof full-mechanized longwall caving panel

被引:1
|
作者
Wang, Hao-sen [1 ,2 ,3 ,5 ]
He, Man-chao [1 ]
Wang, Jiong [1 ]
Yang, Gang [1 ,2 ]
Ma, Zi-min [1 ,4 ]
Ming, Can [1 ,2 ]
Wang, Rui [5 ]
Feng, Zeng-chao [1 ,2 ]
Zhang, Wen-jie [1 ,2 ]
机构
[1] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[3] Univ British Columbia, NBK Inst Min Engn, Vancouver, BC V6T 1Z4, Canada
[4] Shandong Univ Technol, Sch Resource & Environm Engn, Zibo 255000, Peoples R China
[5] Xinjiang Inst Engn, Min Engn & Geol Coll, Urumqi 830023, Peoples R China
基金
中国国家自然科学基金;
关键词
deformation mechanism; hard roof; gob-side entry; cantilever beam; roof pre-splitting; COAL PILLAR; STABILITY; ROCK; EXCAVATION; PREDICTION; MODELS;
D O I
10.1007/s11771-024-5719-z
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel (LTCC). The investigation utilizes a comprehensive approach that integrates field monitoring, theoretical analysis, and numerical simulation. Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof (LCBM) above the roadway on the stability of the gob-side entry behind the panel. Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar, developed cracks around the roadway, and more pronounced damage to the roadway. Moreover, numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof. This technology significantly reduces the length of the LCBM, thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry. Therefore, this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation, and automatically retain the entry within a hard roof LTCC panel. Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.
引用
收藏
页码:3206 / 3224
页数:19
相关论文
共 50 条
  • [1] Pre-splitting control of gob-side entry retaining with hard roof: A case study
    Li, Baoyu
    Zhang, Nong
    Li, Jing
    Lu, Kang
    Electronic Journal of Geotechnical Engineering, 2015, 20 (08): : 3613 - 3621
  • [2] Mechanism and control of deformation in gob-side entry with thick and hard roof strata
    Guo, J. S.
    Ma, L. Q.
    Ngo, I.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2023, 123 (08) : 423 - 434
  • [3] Study on deformation mechanism and control technology of surrounding rock during reuse of gob side entry retaining by roof pre-splitting
    He, Fulian
    Xu, Xuhui
    Qin, Binbin
    Li, Liang
    Lv, Kai
    Li, Xiaobin
    ENGINEERING FAILURE ANALYSIS, 2022, 137
  • [4] Study on loading and deformation mechanism of gob-side roadway with thick and hard basic roof in fully mechanized top coal caving workface
    Jiang W.
    Ju W.
    Wang Z.
    Zhang Z.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (02): : 319 - 326
  • [5] Ground response and failure mechanism of gob-side entry by roof cutting with hard main roof
    Zhu, Heng-zhong
    Xu, Lei
    Wen, Zhi-jie
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (07) : 2488 - 2512
  • [6] Study on Stability Control of Retained Gob-Side Entry by Blasting Fracturing Roof Technology in Thick Immediate Roof
    Guo, Jingang
    Li, Yaohui
    He, Fulian
    Fu, GuangSheng
    Gao, Sheng
    SHOCK AND VIBRATION, 2021, 2021
  • [7] Deformation mechanism and control technology of surrounding rock in gob-side entry retaining by roof cutting of composite hard roof in the Tashan coal mine
    Wang J.
    Li W.
    Liu Y.
    Ma X.
    Sun H.
    Ma L.
    Sun Z.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (05): : 871 - 880
  • [8] An Innovative Approach for Gob-Side Entry Retaining With Thick and Hard Roof: A Case Study
    Zhang, Zizheng
    Wang, Weijun
    Li, Shuqing
    Bai, Jianbiao
    Hao, Shengpeng
    Wu, Hai
    Yu, Xianyang
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2018, 25 (04): : 1028 - 1036
  • [9] Study on the Application of Gob-Side Entry Retaining via Roof Cutting under the Condition of a Hard Thick Roof
    Zhu, Daoyong
    Zhang, Huyue
    Su, Yi
    GEOFLUIDS, 2022, 2022
  • [10] Main roof break structure and surrounding stability analysis in gob-side entry with fully-mechanized caving mining
    Guo J.
    Wang W.
    He F.
    Zhang G.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (03): : 446 - 454and464