Failure factors of building construction projects in Ethiopia

被引:1
|
作者
Abate, Hizkiel Haliso [1 ]
Mengistu, Desalegn Girma [2 ]
Abera, Tesfahun Asres [3 ]
机构
[1] Wolaita Sodo Univ, Coll Engn & Technol, Dept Construct Technol & Management, Soddo, Ethiopia
[2] Hawassa Univ, Inst Technol, Dept Construct Technol & Management, Awasa, Ethiopia
[3] Arba Minch Univ, Arba Minch Inst Technol, Fac Civil Engn, Arba Minch, Ethiopia
关键词
construction projects; competence of stakeholders; Ethiopia; failure factors; project management; AFFECTING SCHEDULE PERFORMANCE; DEVELOPING-COUNTRIES; SUCCESS FACTORS; COST OVERRUNS; DELAY FACTORS; MANAGEMENT;
D O I
10.1080/20421338.2024.2377365
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Construction projects encounter considerable failure, and the case is worse in developing countries. Improving this situation needs an understanding of the failure factors; hence, this study is aimed at identifying critical failure factors of building construction projects in the Ethiopian construction industry. Sixty-four project failure attributes were identified through a literature review and categorized under eight groups of sources. Using a questionnaire survey, one hundred seven valid responses were collected from professionals affiliated with contractors, consultants, clients and regulatory bodies. For the analysis, factor analysis was conducted to identify the underlying dimensions of each group, and multiple regression analysis was conducted to identify critical failure factors. The findings indicate that: (i) unfavourable socio-economic and climatic conditions; (ii) owners' incompetence, change orders and bureaucracy in public clients; (iii) political interferences and inflation; (iv) contractors' incompetence; (v) progress payment, defective works, and staff quality challenges; and (vi) poor productivity, shortage of labour and escalation of material costs are the critical project failure factors in the context of the Ethiopian construction industry. These critical failure factors emanate from four group of sources: client, contractor, project input, and project external environment. The stakeholders need to devise appropriate strategies to mitigate these critical failure factors to ensure project success.
引用
收藏
页码:860 / 880
页数:21
相关论文
共 50 条
  • [41] Current status of factors leading to team performance of on-site construction professionals in Alberta building construction projects
    Hewage, Kasun N.
    Gannoruwa, Anupama
    Ruwanpura, Janaka Y.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2011, 38 (06) : 679 - 689
  • [42] SAFETY ON LARGE BUILDING CONSTRUCTION PROJECTS - DISCUSSION
    NGUYEN, RP
    OFO, IE
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (04): : 642 - 644
  • [43] Dynamic Spatiotemporal Scheduling for Construction Building Projects
    Morin-Pepin, Stephane
    Francis, Adel
    BUILDINGS, 2024, 14 (10)
  • [44] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [45] Risk Identification of Building Construction Projects in Egypt
    Yousri, Elhosin
    Sayed, Ahmed El Badawy
    Farag, Moataz A. M.
    Abdelalim, Ahmed Mohammed
    BUILDINGS, 2023, 13 (04)
  • [46] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [47] Procurement routes in public building and construction projects
    Lædre, O
    Austeng, K
    Haugen, TI
    Klakegg, OJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (07): : 689 - 696
  • [48] Modeling construction time in Spanish building projects
    Guerrero, Miguel A.
    Villacampa, Yolanda
    Montoyo, Andres
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 861 - 873
  • [49] Estimation of Risk Levels for Building Construction Projects
    Maselli, Gabriella
    Nestico, Antonio
    De Mare, Gianluigi
    Merino Gomez, Elena
    Macchiaroli, Maria
    Dolores, Luigi
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2020, PT III, 2020, 12251 : 836 - 851
  • [50] Determinants of construction duration for building projects in Germany
    Dursun, Onur
    Stoy, Christian
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (04) : 444 - +