Redundant Induced Bracing Failures in Transmission Line Towers

被引:0
|
作者
Rao, N. Prasad [1 ]
Balagopal, R. [1 ]
Rokade, R. P. [1 ]
Palani, G. S. [1 ]
机构
[1] CSIR Struct Engn Res Ctr, CSIR Rd, Chennai 600113, Tamil Nadu, India
关键词
Transmission line tower; Redundant; Primary bracing; Failure; Connection detail; Tower testing; BEHAVIOR;
D O I
10.1007/s13296-024-00897-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Transmission line towers designed based on the provisions of different standards may fail during mandatory testing for many reasons. Two different types of premature failures observed during full-scale testing at Tower Testing and Research Station, Structural Engineering Research Centre, Chennai (CSIR-SERC), are studied in this paper. These towers failed prematurely due to improper design assumptions secondary to the primary bracing connection. The failures are modelled using general-purpose finite element software. The test and analytical results are compared with various codal provisions. Hip bracing connected to primary bracing with a single bolt acts as a hinge and fails to provide adequate restraint. The assumption that hip bracing provides restraint to the primary bracing against the in-plane deformation is invalid, and it can only prevent the primary member's displacement along the hip's axis due to its axial stiffness. This study recommends a double bolt connection for redundant members.
引用
收藏
页码:1154 / 1164
页数:11
相关论文
共 50 条
  • [41] Assessment of the backflashover occurrence rate on HV transmission line towers
    Sarajcev, Petar
    Goic, Ranko
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2012, 22 (02): : 152 - 169
  • [42] Online monitoring system of the grounding status of transmission line towers
    Li, Wei
    Lu, Hailiang
    He, Zhiqiang
    Zhu, Changcheng
    Quan, Jiangtao
    Wen, Xishan
    Lecture Notes in Electrical Engineering, 2015, 334 : 449 - 457
  • [43] Joint stress based deflection limits for transmission line towers
    Gayathri, B.
    Ramalingam, Raghavan
    STEEL AND COMPOSITE STRUCTURES, 2018, 26 (01): : 45 - 53
  • [44] RELIABILITY ASSESSMENT OF OVERHEAD TRANSMISSION LINE TOWERS IN THE REPUBLIC OF CROATIA
    Komorski, Ana
    Skejic, Davor
    Dujmovic, Darko
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2013, 20 (03): : 381 - 390
  • [45] Software based on heuristic technique for optimization of transmission line towers
    Structural Engineering Research Centre, CSIR Campus, Taramani, Chennai - 600 113, India
    不详
    J Struct Eng, 2006, 2 (157-166):
  • [46] Behaviour of cold formed lipped angles in transmission line towers
    Mohan, S. J.
    Shabeen, S. Rahima
    Knight, G. M. Samuel
    THIN-WALLED STRUCTURES, 2006, 44 (09) : 1017 - 1030
  • [48] Optimum designs for transmission line towers based on failure modes
    Zheng, Min
    Xiong, Tiehua
    Liang, Shuguo
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2014, 45 (05): : 1672 - 1679
  • [49] Reliability assessment of overhead transmission line towers in the Republic of Croatia
    Procjena pouzdanosti dalekovodnih stupova u Republici Hrvatskoj
    2013, Strojarski Facultet (20):
  • [50] Design of Circular Connector Attached to a Composite Redundant Member for Use in the Bottom Panel of Transmission Towers
    Hernandez Valdez, Alberto
    Ramirez Vazquez, Isaias
    Hernandez Corona, Ramiro
    Vergara Vazquez, Julio
    Ponce Noyola, David
    Brito Luisillo, Alberto
    Ramirez Malpica, Fernando
    Hurtado Hurtado, Carlos
    Paniagua Silva, Antonio
    2017 IEEE 37TH CENTRAL AMERICA AND PANAMA CONVENTION (CONCAPAN XXXVII), 2017,