Optimal Location for Tower Crane and Dynamic Trailer Parking in High-Rise Modular Building Construction Project

被引:0
|
作者
Malaikrisanachalee, Suphawut [1 ]
Wongwai, Narongrit [2 ]
Butsan, Nujet [3 ]
机构
[1] Kasetsart Univ, Dept Civil Engn, Bangkok 10900, Thailand
[2] Kasetsart Univ, Dept Civil Engn, Sriracha Campus, Sriracha 20230, Thailand
[3] Kasetsart Univ, Dept Civil Engn Infrastruct Engn & Management, Bangkok 20230, Thailand
关键词
Tower crane position analysis; Precast building; Dynamic trailer parking; Genetic algorithm; Optimal solution; OPTIMIZATION;
D O I
10.33889/IJMEMS.2024.9.5.051
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Optimization of tower crane positioning is essential in precast building construction to ensure that a crane is in the right position to offer the best value for placing precast elements. The first goal is the optimization of transportation distances made by tower cranes, which will address the issues of efficiency and cost. This is done in a way that provides for minimization of the distances that lie between the trailer parking where elements are parked, the tower crane, and the construction installation point. However, current research fails to address the dynamic movement efficiency of trailers, especially when handling multiple trailers and several models of tower cranes, making this scenario an optimization problem that is classified as NP-hard due to the likelihood of causing a combinatorial explosion. This work endeavors to present a new mathematical model that has been applied to the Genetic Algorithm (GA). The ideal demand-generated model is designed to solve the optimal model and position of tower cranes and the prospective positioning of trailers for parking. The feasibility and applicability of the method exploited in the study are also established through a project case study. When adopting the proposed planning model compared to the earlier planning scale, comparisons highlight a small yet significant saving of 6% in time and cost when lifting elements instead of providing them from the trailers by setting up a new on-site stockyard. In addition, a great deal of enhancement is also observed in the final solution aspects, where the developed GA has even reduced the operational time and cost by half a percent each. The results of this research offer best-practice approaches to the position analysis of tower cranes in precast building construction to bring scalability and cost optimization to bear on the construction business.
引用
收藏
页码:965 / 987
页数:23
相关论文
共 50 条
  • [21] Application of Modular Construction in High-Rise Buildings
    Lawson, R. Mark
    Ogden, Ray G.
    Bergin, Rory
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02)
  • [22] Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
    Hasan, Shafiul
    Bouferguene, Ahmed
    Al-Hussein, Mohamed
    Gillis, Patrick
    Telyas, Avi
    AUTOMATION IN CONSTRUCTION, 2013, 31 : 255 - 264
  • [23] Safety and serviceability assessment for high-rise tower crane to turbulent winds
    Sun Z.
    Hou N.
    Xiang H.
    Frontiers of Architecture and Civil Engineering in China, 2009, 3 (1): : 18 - 24
  • [24] Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
    Zhou, Yong
    Huang, You Zhen
    2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38
  • [25] Engineering modular integrated construction for high-rise building: a case study in Hong Kong
    Shan, Sidi
    Looi, Daniel
    Cai, Yancheng
    Ma, Peng
    Chen, Man Tai
    Su, Ray
    Young, Ben
    Pan, Wei
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (06) : 51 - 57
  • [26] Construction Technology of High-rise Building Structure
    Cheng, Peng
    Chen, Xinfu
    Wu, Lang
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2316 - +
  • [27] Briefing: Modular integrated construction for high-rise buildings
    Pan, Wei
    Hon, Chi Keung
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2020, 173 (02) : 64 - 68
  • [28] Time-dependent analysis during construction of concrete tube for tower high-rise building
    Jiang, Wei
    Gong, Jian
    de Schutter, Geert
    Huang, Yulin
    Yuan, Yong
    STRUCTURAL CONCRETE, 2012, 13 (04) : 236 - 247
  • [29] Analysis of wind impacts on the high-rise building "Iset Tower"
    Alekhin, V. N.
    Antipin, A. A.
    Gorodilov, S. N.
    MECHANICAL ENGINEERING, MATERIALS AND ENERGY II, 2013, 281 : 639 - 644
  • [30] RISE AND SHOCK: OPTIMAL DEFIBRILLATOR PLACEMENT IN A HIGH-RISE BUILDING
    Chan, Timothy C. Y.
    PREHOSPITAL EMERGENCY CARE, 2017, 21 (03) : 309 - 314