Estimation of Groundwater Flow Parameters Based on Simultaneous Calibration for a Series of Vertical Planar Models

被引:0
|
作者
Lukanov, D. D. [1 ]
Rastorguev, I. A. [2 ]
Yurev, S. V. [3 ]
机构
[1] Moscow MV Lomonosov State Univ, Moscow 119991, Russia
[2] NRC Kurchatov Inst, Moscow 119991, Russia
[3] JSC Hydroproject Inst, Moscow 119991, Russia
关键词
parameter estimation; numerical simulation; PEST; !text type='Python']Python[!/text; Feflow; groundwater flow; permeability; profile model;
D O I
10.3103/S0145875224700431
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper describes an algorithm for simultaneous calibration of several groundwater flow planar models. Permeability properties and boundary conditions are considered as the calibration parameters. A special procedure that runs each model sequentially has been developed. The resulting calculated levels by piezometers for each model are transferred by a PEST module. The PEST module uses this and estimates the sensitivity of the model (models) to the parameter values and then iteratively selects parameters so that they satisfy the convergence criterion.
引用
收藏
页码:449 / 454
页数:6
相关论文
共 50 条
  • [21] Estimation of parameters of various damping models in planar motion of a pendulum
    Robert Salamon
    Henryk Kamiński
    Paweł Fritzkowski
    Meccanica, 2020, 55 : 1655 - 1677
  • [22] Simultaneous Traffic Count and Ramp Flow Estimation for Multilane Freeways Based on Markov Models
    Ma, Yong
    Zhang, Liguo
    Zhang, Lu
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 276 - 281
  • [23] ESTIMATION OF PARAMETERS IN LARGE-SIZE SIMULTANEOUS ECONOMETRIC MODELS
    SUJAN, I
    OLEXA, M
    EKONOMICKO-MATEMATICKY OBZOR, 1975, 11 (03): : 335 - 346
  • [24] Estimation of Vertical Datum Parameters Using the GBVP Approach Based on the Combined Global Geopotential Models
    Zhang, Panpan
    Bao, Lifeng
    Guo, Dongmei
    Wu, Lin
    Li, Qianqian
    Liu, Hui
    Xue, Zhixin
    Li, Zhicai
    REMOTE SENSING, 2020, 12 (24) : 1 - 23
  • [25] Calibration of Hydrodynamic Models of Groundwater Flow in Aquifers Polluted by Liquid Radioactive Waste
    Malkovsky, Victor Ioannovich
    PROCESSES, 2022, 10 (05)
  • [26] Use of uncertainty analysis for chloride in the calibration of groundwater flow models of the Sellafield site
    Bath, AH
    Harding, WG
    Forde, K
    Degnan, PJ
    Norris, S
    Jackson, CP
    Watson, SP
    USE OF HYDROGEOCHEMICAL INFORMATION IN TESTING GROUNDWATER FLOW MODELS, 1999, : 79 - 91
  • [27] Calibration of 3-D transient groundwater flow models for fractured rock
    Gómez-Hernández, JJ
    Franssen, HJWMH
    Sahuquillo, A
    Capilla, JE
    CALIBRATION AND RELIABILITY IN GROUNDWATER MODELLING: COPING WITH UNCERTAINTY, 2000, (265): : 185 - 194
  • [28] Calibration of hydraulic parameters for large-scale vertical flow constructed wetlands
    Maier, Uli
    DeBiase, Cecilia
    Baeder-Bederski, Oliver
    Bayer, Peter
    JOURNAL OF HYDROLOGY, 2009, 369 (3-4) : 260 - 273
  • [29] Direct estimation of hydraulic parameters relating to steady state groundwater flow
    Sun, Kerang
    Goltz, Mark N.
    ENVIRONMENTAL MODELLING & SOFTWARE, 2016, 86 : 50 - 55
  • [30] Simultaneous estimation of parameters governing the vertical and horizontal transfer of antibiotic resistance genes
    Mishra, Sulagna
    Klümper, Uli
    Voolaid, Veiko
    Berendonk, Thomas U.
    Kneis, David
    Science of the Total Environment, 2021, 798