Recovery and utilisation of waste heat for sponge iron process through combined preheating and power generation

被引:2
|
作者
Gaurav, Gajendra Kumar [1 ,2 ]
Khanam, Shabina [2 ]
Zhang, Fuchun [1 ]
Liu, Xinghui [3 ,4 ,5 ]
机构
[1] Yanan Univ, Sch Phys & Elect Informat, Yanan 716000, Peoples R China
[2] Indian Inst Technol Roorkee, Dept Chem Engn, Roorkee 247667, India
[3] Saveetha Inst Med & Tech Sci SIMTS, Saveetha Sch Engn, Dept Mat Phys, Thandalam, Chennai 602105, Tamilnadu, India
[4] Hubei Inst Aerosp Chemotechnol, Sci & Technol Aerosp Chem Power Lab, Xiangyang 441003, Peoples R China
[5] Lovely Profess Univ, Div Res & Dev, Phagwara, India
基金
中国国家自然科学基金;
关键词
Preheating; Power generation; Economic analysis; Boiler-turbine system; Duct temperature profile; ROTARY KILN; ENERGY;
D O I
10.1016/j.energy.2024.131512
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper deals with an option accounted for total waste gas heat recovered through combined preheating as well as power generation of feed material, kiln air, as well as slinger coal when it reaches 250 degrees C from 994 degrees C. The heat recovery is obtained through GCC Profile is plotted using HINT software. The power produced is 2.757 MW with an optimal condition having a temperature of 280 degrees C saturated, 600 degrees C superheated, as well as superheated pressure of 350 bar. The heat required around the superheater, boiler and preheater is 5066.9 kW, 12,669.93 kW and 6873.6 kW. The air requirement for this option is 52.588 t/h after iteration. Also, the iterative waste gas flow rate is 22.31 kg/s. Three new heat exchangers are required to achieve possible heat recovery by designing HEN through Pinch Analysis. The water requirement around EC is 14.88 t/h and 7.8 t/h as in the case of actual and modified HEN. The calculated pressure drops of different ducts having lengths 25 m and pressure 0.034 atm, 80 and 105 m are obtained pressure as 0.034, 0.12 and 0.16 atm. 3 FD fans are required for maintenance of required pressures in the duct. The TAC is INR 8068.8/y; payback period is 2.62 y.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Performance of innovative dual pressure waste heat recovery power generation system in dry-process kiln
    Li, Qianjun
    Huang, Jintao
    2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [42] Waste heat recovery from metal casting and scrap preheating using recovered heat
    Selvaraj, J.
    Varun, V. S.
    Vignesh
    Vishwam, Vishnu
    12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 267 - 276
  • [43] Power generation through recovery of natural gas pressure loss and waste heat energy of steam power plant in expansion turbine
    Sadeghi, H
    Fouladi, H
    Kazemi, HA
    Energy-Efficient, Cost-Effective and Environmentally-Sustainable Systems and Processes, Vols 1-3, 2004, : 1255 - 1263
  • [44] Feasibility study of power generation through waste heat recovery of wood burning stove using the ORC technology
    Rahbar, Kiyarash
    Mahmoud, Saad
    Al-Dadah, Raya K.
    Moazami, Nima
    Ashmore, David
    SUSTAINABLE CITIES AND SOCIETY, 2017, 35 : 594 - 614
  • [45] Design of a Thermoelectric Device for Power Generation through Waste Heat Recovery from Marine Internal Combustion Engines
    Konstantinou, Georgios
    Kyratsi, Theodora
    Louca, Loucas S.
    ENERGIES, 2022, 15 (11)
  • [46] Current progress of process integration for waste heat recovery in steel and iron industries
    Inayat, Abrar
    FUEL, 2023, 338
  • [47] Investigation on gasoline homogeneous charge compression ignition (HCCI) combustion implemented by residual gas trapping combined with intake preheating through waste heat recovery
    Xie, Hui
    Li, Le
    Chen, Tao
    Zhao, Hua
    ENERGY CONVERSION AND MANAGEMENT, 2014, 86 : 8 - 19
  • [48] An analysis on comprehensive influences of thermoelectric power generation based on waste heat recovery
    Dong, Cong
    Shi, Yuanyuan
    Li, Qipeng
    Gu, Huaduo
    Li, Dongshuang
    Ye, Yanghui
    Li, Teng
    CASE STUDIES IN THERMAL ENGINEERING, 2023, 44
  • [49] OPTIMIZATION OF WASTE HEAT RECOVERY POWER GENERATION SYSTEM APPLIED IN FERROALLOY INDUSTRY
    Wang, Yufeng
    Zhao, Shuai
    Hui, Shien
    Zhao, Qinxin
    Zhou, Qulan
    PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 117 - +
  • [50] Waste heat recovery and power generation in cement clinker production: An energetic comparison
    Werner, A.
    Leibinger, H.
    Cement International, 2014, 12 (06): : 40 - 43