Human error identification and risk assessment in loading and unloading of petroleum products by road trucks using the SHERPA and fuzzy inference system method

被引:2
|
作者
Aliabadi, Mostafa Mirzaei [1 ]
Mohammadfam, Iraj [2 ]
Khorshidikia, Samane [3 ]
机构
[1] Hamadan Univ Med Sci, Ctr Excellence Occupat Hlth Occupat Hlth, Safety Res Ctr, Sch Publ Hlth, Hamadan, Iran
[2] Univ Social Welf & Rehabil Sci, Hlth Emergency & Disaster Res Ctr, Dept Ergon, Tehran, Iran
[3] Hamadan Univ Med Sci, Occupat Hlth & Safety Res Ctr, Sch Publ Hlth, Occupat Hlth Engn, Hamadan, Iran
关键词
Human error; Loading operation; Unloading operation; Road truck; SHERPA; Fuzzy inference system (FIS); FAULT-TREE ANALYSIS; PREDICTION; MODEL;
D O I
10.1016/j.heliyon.2024.e34072
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Human error constitutes one of the primary causes of accidents, particularly in the context of loading and unloading operations involving road trucks, especially those carrying petroleum products. The process of identifying and evaluating human errors within these operations involves several key steps. Initially, all sub-tasks associated with loading and unloading are meticulously identified and analyzed utilizing Hierarchical Task Analysis (HTA), achieved through direct observation, document examination, and interviews. Subsequently, potential human error modes within each task are delineated using the Systematic Human Error Reduction and Prediction Approach (SHERPA). Finally, essential data for determining the criticality, probability, and severity of each error are gathered through expert elicitation and the application of Fuzzy Inference Systems (FIS). Through the analysis of SHERPA worksheets, a total of 37 errors during loading operations and 14 errors during unloading operations of petroleum products were identified. Among these errors, the predominant category during loading operations was action errors, comprising 31 instances, while communication errors were the least frequent, occurring only twice. Similarly, action errors were most prevalent during unloading operations, constituting 13 instances. These errors were further categorized and ranked based on their risk levels, resulting in 27 levels for loading operations and 12 levels for unloading operations. The consistent occurrence of action errors underscores the need for implementing control measures to mitigate their frequency and severity. Such strategies may include periodic training sessions to reinforce proper work procedures and the development of monitoring checklists, among other interventions.
引用
收藏
页数:17
相关论文
共 49 条
  • [21] Decision Support System for Risk Assessment Using Fuzzy Inference in Supply Chain Big Data
    Salamai, Abdullah
    Hussain, Omar
    Saberi, Morteza
    2019 INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE BIG DATA AND INTELLIGENT SYSTEMS (HPBD&IS), 2019, : 248 - 253
  • [22] Fuzzy expert system for road type identification and risk assessment of conventional two-lane roads
    Barreno, Felipe
    Romana, Manuel G.
    Santos, Matilde
    EXPERT SYSTEMS, 2022, 39 (09)
  • [23] An integrated approach to occupational health risk assessment of manufacturing nanomaterials using Pythagorean Fuzzy AHP and Fuzzy Inference System
    Samaneh Salari
    Mohsen Sadeghi-Yarandi
    Farideh Golbabaei
    Scientific Reports, 14
  • [24] An integrated approach to occupational health risk assessment of manufacturing nanomaterials using Pythagorean Fuzzy AHP and Fuzzy Inference System
    Salari, Samaneh
    Sadeghi-Yarandi, Mohsen
    Golbabaei, Farideh
    SCIENTIFIC REPORTS, 2024, 14 (01)
  • [25] USING DUAL-ADAPTIVE NEURO-FUZZY INFERENCE SYSTEM IN PILOT'S RISK ASSESSMENT
    Xu, Kaijun
    DECISION MAKING AND SOFT COMPUTING, 2014, 9 : 80 - 85
  • [27] Development of a human error risk assessment model in high priority emergency situation using TOPSIS, FUZZY-AHP and CREAM method
    Abbasinia, Marzieh
    Kalatpour, Omid
    Motamedzade, Majid
    Soltanian, Ali Reza
    Mohammadfam, Iraj
    Ganjipour, Mohammad
    JOURNAL OF HEALTH AND SAFETY AT WORK, 2022, 12 (02) : 339 - 351
  • [28] A study on quantification for the impact of stress and time margin on human error probability assessment in nuclear power plant using fuzzy inference
    Jang, Sunghyon
    Sawa, Kazuhiro
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2025, 57 (05)
  • [29] NONLINEAR IDENTIFICATION AND MEDICAL DIAGNOSIS SYSTEM USING FUNCTIONAL-TYPE SIRMS CONNECTED FUZZY INFERENCE METHOD
    Seki, Hirosato
    Ishii, Hiroaki
    Mizumoto, Masaharu
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2010, 6 (11): : 5275 - 5286
  • [30] Construction project risk assessment by using adaptive-network-based fuzzy inference system: An empirical study
    Mehdi Ebrat
    Reza Ghodsi
    KSCE Journal of Civil Engineering, 2014, 18 : 1213 - 1227