PROJECT SELECTION REVISITED: CUSTOMIZED TYPE-2 FUZZY ORESTE APPROACH FOR PROJECT PRIORITIZATION

被引:0
|
作者
Uluskan, Meryem [1 ]
Beki, Busra [1 ]
机构
[1] Dept Ind Engn, Eskisehir Osmangazi Univ, Eskisehir, Turkiye
关键词
Interval Type-2 Fuzzy ORESTE; Fuzzy TOPSIS; Project Selection; Multicriteria Decision-Making; Automotive Industry; DECISION-MAKING; AHP; INTEGRATION; FRAMEWORK; MOORA;
D O I
10.23055/ijietap.2024.31.2.9853
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, a customized version of a less -preferred methodology in decision -making processes, i.e., the interval type -2 fuzzy ORESTE (IT2F-ORESTE), is proposed, and its effectiveness for selecting the most viable projects is demonstrated. The findings are evaluated against those of fuzzy TOPSIS, which is among the most preferred methods, to provide evidence that the proposed method achieves comparable and even superior results. To this end, multicriteria decision -making studies conducted between 2016 and 2021 were examined. Subsequently, 30 automotive manufacturing projects were evaluated over seven criteria using the fuzzy TOPSIS and customized IT2F-ORESTE methods. The results revealed that IT2FORESTE assigned the highest ranks to projects with high earning potential, low cost, low number of operations, and high production capacity, whereas fuzzy TOPSIS failed to select the best project. To the best of the authors' knowledge, this is the first study to utilize this new IT2F-ORESTE method in project evaluation within the automotive industry and demonstrate its superiority over that of conventional methods.
引用
收藏
页码:317 / 339
页数:23
相关论文
共 50 条
  • [1] An Interval Type-2 Fuzzy Prioritization Approach to Project Risk Assessment
    Asan, Umut
    Soyer, Ayberk
    Bozdag, Erhan
    [J]. JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2016, 26 (06) : 541 - 577
  • [2] R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach
    V. Mohagheghi
    S. M. Mousavi
    B. Vahdani
    M. R. Shahriari
    [J]. Neural Computing and Applications, 2017, 28 : 3869 - 3888
  • [3] R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach
    Mohagheghi, V.
    Mousavi, S. M.
    Vahdani, B.
    Shahriari, M. R.
    [J]. NEURAL COMPUTING & APPLICATIONS, 2017, 28 (12): : 3869 - 3888
  • [4] A TYPE-2 FUZZY OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION AND SCHEDULING BY INCORPORATING PROJECT INTERDEPENDENCY AND SPLITTING
    Zolfaghari, Samaneh
    Mousavi, Seyed Meysam
    Antucheviciene, Jurgita
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2021, 27 (02) : 493 - 510
  • [5] Flood Control Project Selection using an Interval Type-2 Entropy Weight with Interval Type-2 Fuzzy TOPSIS
    Zamri, Nurnadiah
    Abdullah, Lazim
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MATHEMATICAL SCIENCES, 2014, 1602 : 62 - 68
  • [6] A Group Decision Making Approach Using Interval Type-2 Fuzzy AHP for Enterprise Information Systems Project Selection
    Oztaysi, Basar
    [J]. JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2015, 24 (5-6) : 475 - 500
  • [7] A Multi-Objective Optimization and Fuzzy Prioritization Approach for Project Risk Responses Selection
    Nik, Ebrahim Rezaee
    Zegordi, Seyed Hessameddin
    Nazari, Ahad
    [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 888 - 892
  • [8] A fuzzy AHP-based methodology for project prioritization and selection
    Shaygan, Amir
    Testik, Ozlem Muge
    [J]. SOFT COMPUTING, 2019, 23 (04) : 1309 - 1319
  • [9] A fuzzy AHP-based methodology for project prioritization and selection
    Amir Shaygan
    Özlem Müge Testik
    [J]. Soft Computing, 2019, 23 : 1309 - 1319
  • [10] Project Selection and Prioritization of Pavement Preservation Competitive Approach
    Gurganus, Charles F.
    Gharaibeh, Nasir G.
    [J]. TRANSPORTATION RESEARCH RECORD, 2012, (2292) : 36 - 44