PROJECT SELECTION REVISITED: CUSTOMIZED TYPE-2 FUZZY ORESTE APPROACH FOR PROJECT PRIORITIZATION

被引:0
|
作者
Uluskan, Meryem [1 ]
Beki, Busra [1 ]
机构
[1] Dept Ind Engn, Eskisehir Osmangazi Univ, Eskisehir, Turkiye
关键词
Interval Type-2 Fuzzy ORESTE; Fuzzy TOPSIS; Project Selection; Multicriteria Decision-Making; Automotive Industry; DECISION-MAKING; AHP; INTEGRATION; FRAMEWORK; MOORA;
D O I
10.23055/ijietap.2024.31.2.9853
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, a customized version of a less -preferred methodology in decision -making processes, i.e., the interval type -2 fuzzy ORESTE (IT2F-ORESTE), is proposed, and its effectiveness for selecting the most viable projects is demonstrated. The findings are evaluated against those of fuzzy TOPSIS, which is among the most preferred methods, to provide evidence that the proposed method achieves comparable and even superior results. To this end, multicriteria decision -making studies conducted between 2016 and 2021 were examined. Subsequently, 30 automotive manufacturing projects were evaluated over seven criteria using the fuzzy TOPSIS and customized IT2F-ORESTE methods. The results revealed that IT2FORESTE assigned the highest ranks to projects with high earning potential, low cost, low number of operations, and high production capacity, whereas fuzzy TOPSIS failed to select the best project. To the best of the authors' knowledge, this is the first study to utilize this new IT2F-ORESTE method in project evaluation within the automotive industry and demonstrate its superiority over that of conventional methods.
引用
收藏
页码:317 / 339
页数:23
相关论文
共 50 条
  • [11] A fuzzy integrated approach for project selection
    Bolat, Bersam
    Cebi, Ferhan
    Temur, Gul Tekin
    Otay, Irem
    [J]. JOURNAL OF ENTERPRISE INFORMATION MANAGEMENT, 2014, 27 (03) : 247 - +
  • [12] Type-2 fuzzy numbers in models of the duration of a project affected by risk
    Gladysz, Barbara
    [J]. JOURNAL OF DECISION SYSTEMS, 2020, 29 : 375 - 382
  • [13] A modified fuzzy approach to project team selection
    Kalayathankal, Sunny Joseph
    Kureethara, Joseph Varghese
    Narayanamoorthy, Samayan
    [J]. Soft Computing Letters, 2021, 3
  • [14] Multi-Criteria Project Selection Using an Extended VIKOR Method with Interval Type-2 Fuzzy Sets
    Keshavarz Ghorabaee, Mehdi
    Amiri, Maghsoud
    Sadaghiani, Jamshid Salehi
    Zavadskas, Edmundas Kazimieras
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2015, 14 (05) : 993 - 1016
  • [15] An Extended Interval Type-2 Fuzzy ORESTE Method for Risk Analysis in FMEA
    Zheng, Qiaohong
    Liu, Xinwang
    Wang, Weizhong
    [J]. INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (05) : 1379 - 1395
  • [16] An Extended Interval Type-2 Fuzzy ORESTE Method for Risk Analysis in FMEA
    Qiaohong Zheng
    Xinwang Liu
    Weizhong Wang
    [J]. International Journal of Fuzzy Systems, 2021, 23 : 1379 - 1395
  • [17] Research Project Planning Based on SCRUM Framework and Type-2 Fuzzy Numbers
    Klaus-Rosinska, Agata
    Schneider, Jan
    Bulla, Vivian
    [J]. INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2018, PT III, 2019, 854 : 381 - 391
  • [18] An interval type-2 fuzzy ORESTE method for waste-to-energy plant site selection: A case study in China
    Pan, Xiao-Hong
    Wang, Ying-Ming
    He, Shi-Fan
    Labella, Alvaro
    Martinez, Luis
    [J]. APPLIED SOFT COMPUTING, 2023, 136
  • [19] A NEW FUZZY APPROACH FOR PROJECT SELECTION WITH OUTSOURCING VIEWPOINT
    Bashiri, Mahdi
    Badri, Hossein
    Talebi, Jafar
    [J]. INTERNATIONAL JOURNAL OF INNOVATION AND TECHNOLOGY MANAGEMENT, 2011, 8 (02) : 227 - 251
  • [20] Construction project selection using fuzzy TOPSIS approach
    Tan, Yong-tao
    Shen, Li-yin
    Langston, Craig
    Liu, Yan
    [J]. JOURNAL OF MODELLING IN MANAGEMENT, 2010, 5 (03) : 302 - 315