An Interval Type-2 Fuzzy Prioritization Approach to Project Risk Assessment

被引:0
|
作者
Asan, Umut [1 ]
Soyer, Ayberk [1 ]
Bozdag, Erhan [1 ]
机构
[1] Istanbul Tech Univ, Dept Ind Engn, TR-34357 Istanbul, Turkey
关键词
Project risk assessment; interval type-2 fuzzy numbers; multi-criteria group decision making; analytic hierarchy process; new product development projects; ANALYTIC HIERARCHY PROCESS; CRITERIA DECISION-ANALYSIS; INFORMATION-TECHNOLOGY; CONSTRUCTION PROJECTS; MANAGEMENT; SELECTION; SYSTEMS; SETS;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Assessment of project risks generally requires dealing with vague and imprecise information as well as highly subjective judgments of a group of experts. Therefore, it is often unrealistic and impractical to acquire exact judgments in project risk assessment. Several precision-and fuzzy-based methods, addressing this issue, have been suggested in the literature. However, these studies entirely or partly have ignored certain sources of uncertainties, especially subjectivity and variations among expert judgments. This paper proposes an interval type-2 fuzzy prioritization approach that effectively models the project risk assessment process. The approach captures at least two types of uncertainties associated with judgments elicited from a group of experts: intra-personal uncertainty and inter-personal uncertainty. In order to demonstrate the applicability and effectiveness of the proposed approach, an example is presented for the assessment of potential risks in new product development projects. Comparisons with current precision-and fuzzy-based methods demonstrate that the proposed approach offers additional flexibility to the experts in making judgments and provides a better representation of uncertainty.
引用
收藏
页码:541 / 577
页数:37
相关论文
共 50 条
  • [1] An interval type-2 fuzzy reasoning model for digital transformation project risk assessment
    Golcuk, Ilker
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2020, 159
  • [2] PROJECT SELECTION REVISITED: CUSTOMIZED TYPE-2 FUZZY ORESTE APPROACH FOR PROJECT PRIORITIZATION
    Uluskan, Meryem
    Beki, Busra
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (02): : 317 - 339
  • [3] Risk prioritization in Failure Mode and Effects Analysis using interval type-2 fuzzy sets
    Bozdag, Erhan
    Asan, Umut
    Soyer, Ayberk
    Serdarasan, Seyda
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (08) : 4000 - 4015
  • [4] Interval type-2 fuzzy automata and Interval type-2 fuzzy grammar
    S. Sharan
    B. K. Sharma
    Kavikumar Jacob
    [J]. Journal of Applied Mathematics and Computing, 2022, 68 : 1505 - 1526
  • [5] Interval type-2 fuzzy automata and Interval type-2 fuzzy grammar
    Sharan, S.
    Sharma, B. K.
    Jacob, Kavikumar
    [J]. JOURNAL OF APPLIED MATHEMATICS AND COMPUTING, 2022, 68 (03) : 1505 - 1526
  • [6] An interval approach to fuzzistics for interval type-2 fuzzy sets
    Liu, Feilong
    Mendel, Jerry A.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-4, 2007, : 1029 - 1034
  • [7] Risk assessment for the industrial network based on interval type-2 fuzzy sets
    Ren, Chao
    Liu, Xiaoxing
    Zhang, Zongqing
    [J]. KYBERNETES, 2020, 49 (03) : 916 - 937
  • [8] Prioritization of Business Analytics Projects Using Interval Type-2 Fuzzy AHP
    Oztaysi, Basar
    Onar, Sezi Cevik
    Kahraman, Cengiz
    [J]. ADVANCES IN FUZZY LOGIC AND TECHNOLOGY 2017, VOL 3, 2018, 643 : 106 - 117
  • [9] Flood Control Project Selection using an Interval Type-2 Entropy Weight with Interval Type-2 Fuzzy TOPSIS
    Zamri, Nurnadiah
    Abdullah, Lazim
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MATHEMATICAL SCIENCES, 2014, 1602 : 62 - 68
  • [10] Investment project assessment by a MAGDM method based on the ranking of interval type-2 fuzzy sets
    Zhou, Lintao
    Wang, Yanfeng
    Jiang, Yong
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (02) : 1875 - 1888