Digital Application of Construction Project Cost Risk Control and Management Based on BIM Technology

被引:0
|
作者
Li, Xiufang [1 ]
Jia, Xiaorui [1 ]
Huang, Mingqiang [1 ]
机构
[1] Xiamen University of Technology, Fujian, Xiamen,361024, China
关键词
Architectural design - Budget control - Cost benefit analysis - Cost engineering - Investments - Project management - Structural design;
D O I
10.2478/amns-2024-0529
中图分类号
学科分类号
摘要
The core objective of this study is to explore the application of BIM technology in the whole process of cost management of construction projects and to assess the project risk. The study covers the key stages of project planning, design, transaction and construction, and focuses on analyzing the cost management process of investment decision, design estimate, transaction and construction. Through questionnaire surveys and expert interviews with 72 valid samples, this study collects data on green building and analyzes the quality of the risk assessment data. Through questionnaire survey and expert interviews with 72 good samples, this study collects data on green building and analyzes the quality of the risk assessment data. In establishing the BIM-based project cost risk model, the study analyzes the management elements of BIM and IPD in detail, including the quantification of technical and management components. three case projects show that the application of BIM and IPD technologies in different projects has different focuses, and produces other management effects. for example, the number of engineering changes (e.g., the number of changes to the project) exhibited by the project B For example, the number of project changes (NCO) is 35, the cost change rate (COP) is 0.93%, the duration change rate (DCP) is -10.25%, and the number of contract negotiations (NRFI) is 6. The risk evaluation model is applied in a mixed-use project in Xiamen, China, and the results of the simulation experiments show that the method is effective in realizing the risk assessment of the construction project, and the clustered nature of the output features is good. The average value of the risk fuzzy variable is 0.576, and the minimum value is 0.192. © 2023 Xiufang Li, Xiaorui Jia and Mingqiang Huang, published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [21] Design and application of BIM based digital sand table for construction management
    Ji Fuquan
    Li Jianqiang
    Liu Weijia
    [J]. 2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153
  • [22] BIM Digital technology in the construction industry in the field of application
    Zhu Li
    Lian Wen-shan
    Wang Fei
    [J]. SMART MATERIALS AND INTELLIGENT SYSTEMS, PTS 1 AND 2, 2011, 143-144 : 1375 - 1379
  • [23] Cost management of power grid transmission and substation project based on BIM technology
    Wang, Songsong
    Qiao, Wenxuan
    Wang, Lei
    Shen, Zhewei
    Yang, Pengju
    Bian, Li
    [J]. APPLIED MATHEMATICS AND NONLINEAR SCIENCES, 2023, 8 (02) : 1433 - 1446
  • [24] The Application of the Whole Process Management in the Green Construction Project of Cost Control
    Li, Jian-Feng
    Zhang, Yuan
    [J]. 2016 INTERNATIONAL CONFERENCE ON MANAGEMENT, ECONOMICS AND SOCIAL DEVELOPMENT (ICMESD 2016), 2016, : 901 - 906
  • [25] Construction cost management strategy based on BIM technology and neural network model
    Ding, Xiaojing
    Lu, Qiulan
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 40 (04) : 6669 - 6681
  • [26] Exploring the Application of BIM Technology in the Whole Process of Construction Cost Management with Computational Intelligence
    Tang, Dan
    Liu, Kongling
    [J]. COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [27] Research and application of data mining technology on construction project cost control system
    Zhou, Ying
    Ding, Lie Yun
    [J]. Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 471 - 476
  • [28] Research on Evaluation Method of Cost Management and Control Effect of Power Transmission and Transformation Project Based on BIM Technology
    Zhang Duo
    Wang Zhengping
    Yin Chenlei
    [J]. 2021 5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL SCIENCE (AEECS 2021), 2021, 245
  • [29] The Application of BIM Technology in the whole Life Cycle of Construction Project
    Li, Ziang
    [J]. 2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [30] Analysing the implementation motivations of BIM Technology in Construction Project Management
    Mesaros, Peter
    Spisakova, Marcela
    Mandicak, Tomas
    [J]. 5TH WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM (WMCAUS), 2020, 960