Green integrated scheduling of U-shaped automated terminals under uncertainty

被引:0
|
作者
Xu B. [1 ]
Jie D. [1 ]
Li J. [2 ]
Yang Y. [1 ]
机构
[1] Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai
[2] College of Merchant Marine, Shanghai Maritime University, Shanghai
基金
上海市自然科学基金; 中国国家自然科学基金;
关键词
energy consumption; green integrated scheduling; hybrid genetic cuckoo algorithm; U-shaped automated container terminal; uncertainty;
D O I
10.13196/j.cims.2022.12.030
中图分类号
学科分类号
摘要
To improve the operating efficiency of U-shaped automated container terminal and to promote the development of green port, aiming at the loading and unloading process of "dual trolley quay crane + Automated Guided Vehicle (AGV) + dual cantilever rail crane + external truck", considering the uncertainty of external truck arrival, a green waiting strategy was proposed by using the related theory of hybrid flow shop scheduling. With the goal of minimizing the completion time of all tasks and minimizing carbon emission of operating equipment, a multi-objective green integrated scheduling model was constructed and an improved hybrid genetic cuckoo algorithm was designed to solve the model. Through small, medium and large-scale container operation task experiments, the proposed algorithm was compared with genetic algorithm, adaptive genetic algorithm and grey wolf optimizer algorithm to verify its effectiveness. The results showed that the result of no wait strategy was better when the task size was small, and with the increase of task size, the difference between them decreased gradually. When the task scale was large, the result of waiting strategy was better. © 2022 CIMS. All rights reserved.
引用
收藏
页码:4057 / 4068
页数:11
相关论文
共 50 条
  • [21] Multiple equipment scheduling and AGV trajectory generation in U-shaped sea-rail intermodal automated container terminal
    Liu, Wenqian
    Zhu, Xiaoning
    Wang, Li
    Wang, Shuai
    [J]. MEASUREMENT, 2023, 206
  • [22] THE BUCKLING BEHAVIOR OF U-SHAPED BELLOWS UNDER PRESSURE LOADS
    TSUKIMORI, K
    IWATA, K
    [J]. INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1990, 44 (03) : 365 - 380
  • [23] A gate enhanced power U-shaped MOSFET integrated with a Schottky rectifier
    Wang Ying
    Jiao Wen-Li
    Hu Hai-Fan
    Liu Yun-Tao
    Cao Fei
    [J]. CHINESE PHYSICS B, 2012, 21 (05)
  • [24] A gate enhanced power U-shaped MOSFET integrated with a Schottky rectifier
    王颖
    焦文利
    胡海帆
    刘云涛
    曹菲
    [J]. Chinese Physics B, 2012, (05) : 445 - 448
  • [25] INTEGRATED SCHEDULING OF EQUIPMENT FOR QUAYSIDE TRANSPORT IN AUTOMATED SEAPORT CONTAINER TERMINALS
    Gujjula, R.
    Guenther, H.-O.
    [J]. TRANSPORTATION AND MANAGEMENT SCIENCE, 2008, : 719 - 727
  • [26] Optimization of integrated scheduling of handling and storage operations at automated container terminals
    Homayouni S.M.
    Tang S.H.
    [J]. WMU Journal of Maritime Affairs, 2016, 15 (1) : 17 - 39
  • [27] Integrated Operational Planning and Scheduling under Uncertainty
    Verderame, Peter M.
    Floudas, Christodoulos A.
    [J]. 19TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2009, 26 : 381 - 386
  • [28] An integrated approach for surgery scheduling under uncertainty
    Wang, Jin
    Guo, Hainan
    Bakker, Monique
    Tsui, Kwok-Leung
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 : 1 - 8
  • [29] Integrated optimization model for automated lifting vehicles scheduling and yard allocation at automated container terminals
    International College, Dalian University, Dalian
    116622, China
    不详
    116026, China
    [J]. Xitong Gongcheng Lilum yu Shijian, 5 (1349-1359):
  • [30] ESG ratings and green innovation: A U-shaped journey towards sustainable development
    Yang, Cunyi
    Zhu, Conghao
    Albitar, Khaldoon
    [J]. BUSINESS STRATEGY AND THE ENVIRONMENT, 2024, 33 (05) : 4108 - 4129