Dynamic characteristics and experimental verification of the new type of deck arch bridge

被引:0
|
作者
Yan, Chenyu [1 ]
Pang, Mulin [1 ]
Xie, Xiaoli [1 ]
机构
[1] College of Civil Engineering and Architecture, Guangxi University, Nanning,530004, China
关键词
Arch bridges - Finite element method - Vibration analysis - Arches - Natural frequencies;
D O I
10.19713/j.cnki.43-1423/u.T20201105
中图分类号
学科分类号
摘要
In order to solve the problems of small structural stiffness and low natural frequency of the long-span deck arch bridge, a new type of arch bridge structure was proposed in this paper. The specific method is presentedas follows: the pillar is changed into a triangular mesh with the auxiliary arch. Therefore, the doublelayer truss structure is formed, which will improve the stiffness and stability of the structure then improve the dynamic characteristics of the structure. For studying the dynamic characteristics of the new type of deck arch bridge, two test bridges with 10 m span were built and environmental vibration test was carried out, then the natural frequency of the first in-plane vibration of the structure was measured. Finite element software was used to calculate the stiffness and dynamic characteristics of the structure. The test and finite element results show that the natural frequency of the first in-plane vibration of the new type of deck arch bridge is significantly higher than that of the traditional deck arch bridge. Furthermore, the measured vibration mode is consistent with the finite element analysis; On the premise of not increasing the amount of steel used, the natural frequency of new type of deck arch bridge is higher than that of the traditional deck arch bridge when the out-of-plane, in-plane and torsional vibration modes appear for the first time; The stiffness of the new type of deck arch bridge is greatly improved. The sum of the maximum absolute values of verticaldeflection of the main beam is greatly reduced under the action of dynamic trainloading. © 2021, Central South University Press. All rights reserved.
引用
收藏
页码:2620 / 2629
相关论文
共 50 条
  • [41] Conceptual design and experimental verification study of a special-shaped composite arch bridge
    Lu, Pengzhen
    Zhang, Junping
    Li, Dengguo
    Zhou, Yutao
    Shi, Qingtian
    STRUCTURES, 2021, 29 : 1380 - 1389
  • [42] Nonlinear Stability Analysis of Qijiadu Long-Span Deck-Type CFST Arch Bridge
    Xu, Liang
    Wu, Yaping
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 1685 - 1691
  • [43] An experimental study of bridge deck cracking using type K-cement
    Richardson, Douglas
    Tung, Ying
    Tobias, Daniel
    Hindi, Riyadh
    CONSTRUCTION AND BUILDING MATERIALS, 2014, 52 : 366 - 374
  • [44] Dynamic stability of leaning-type arch bridge under earthquake
    Liu, Ai-Rong
    Yu, Qi-Cai
    Song, Rui
    Zhang, Jun-Ping
    Shenzhen Daxue Xuebao (Ligong Ban)/Journal of Shenzhen University Science and Engineering, 2010, 27 (03): : 286 - 290
  • [45] Tensegrity footbridges with arch deck: static and dynamic behaviour
    Briseghella, Bruno
    Fenu, Luigi
    Huang, Wenjin
    Zordan, Tobia
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ARCH BRIDGES (ARCH '10), 2010, : 287 - 294
  • [46] Static behavior of a new type of cable-arch bridge
    Kang, H. J.
    Zhao, Y. Y.
    Zhu, H. P.
    Jin, Y. X.
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2013, 81 : 1 - 10
  • [47] Dynamic response of a bridge with surface deck irregularities
    Michaltsos, GT
    Konstantakopoulos, TG
    JOURNAL OF VIBRATION AND CONTROL, 2000, 6 (05) : 667 - 689
  • [48] Experimental Verification of GFRP Bridge Deck Panels Using an Integrated Distributed Fiber Optic Sensing System
    Kulpa, Maciej
    Howiacki, Tomasz
    Rajchel, Mateusz
    Siwowski, Tomasz
    Bednarski, Lukasz
    JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2024, 28 (05)
  • [49] Behaviour Analysis of Prestressed Concrete Deck-Tied Arch Bridge
    Xiang, Yiqiang
    Zhang, Lichang
    Wu, Qiangqiang
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 952 - 956
  • [50] Analysis on Deck Replacement Plans of tied arch bridge with composite girder
    Qing-Tian, S.
    Ming-gen, Z.
    Chong, W.
    Bing, D.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1354 - 1358