Analysis on Deck Replacement Plans of tied arch bridge with composite girder

被引:0
|
作者
Qing-Tian, S. [1 ]
Ming-gen, Z. [1 ]
Chong, W. [1 ]
Bing, D. [1 ]
机构
[1] Tongji Univ, Shanghai 200092, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridge decks in composite bridges endure directly local vehicle load and failure is apt to occur in bridge decks, so the decks in Jiubao Bridge are designed to renewable component. Space finite element model of Jiubao Bridge was established. Stress variation of upper and lower edge of the girder under dead load was analyzed when each deck changed locally. Stress variation processes of various whole span replacement plans were also analyzed and the stress envelope was obtained. The calculation results show that local bridge deck replacement has no obvious influence on the steel girder stress. While the plan that remove bridge decks from mid-span to arch foot has less influence on the girder stress compared to other whole span replacement plan.
引用
收藏
页码:1354 / 1358
页数:5
相关论文
共 50 条
  • [1] EXPERIMENTAL STUDY ON COMPOSITE DECK OF THROUGH TIED-ARCH BRIDGE
    Zhou, De
    Ye, Mei-Xin
    Chen, Jia
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 548 - 554
  • [2] Behaviour Analysis of Prestressed Concrete Deck-Tied Arch Bridge
    Xiang, Yiqiang
    Zhang, Lichang
    Wu, Qiangqiang
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 952 - 956
  • [3] Study on Tied Arch Bridge with Through Girder Design
    Wu, Xun
    Li, Hui
    Zhang, Zhichao
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MATERIALS, ENVIRONMENTAL AND BIOLOGICAL ENGINEERING, 2015, 10 : 1033 - 1036
  • [4] FINITE ELEMENT ANALYSIS OF TIED ARCH BRIDGE FOR SUSPENDERS REPLACEMENT
    Zhao Yang
    Li Xiaoke
    Zhao Shunbo
    Yu Ya'nan
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1531 - 1534
  • [5] Analysis on Deck Replacement Plans of the Main Span of Jiubao Bridge
    Su Qing-Tian
    Yang Guo-Tao
    Wu Chong
    MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 450 - 456
  • [6] Local Stress Analysis of Arch Foot for Trough Girder and Arch Composite Bridge
    Wu, Xun
    Gu, Dong
    Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 961 - 964
  • [7] Detailed Analysis of Arch Foot of a Trough Girder and Arch Composite Bridge with FEA
    Wu, Xun
    Tao, Zhong-Min
    Li, Jie
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING, 2014, 7 : 961 - 964
  • [8] Bridge Deck Transverse Stress Analysis of Arch Tower Cable-Stayed Bridge With Steel Box Girder
    Cao, Yishan
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1240 - 1244
  • [9] Girder-Deck Interface: Partial Debonding, Deck Replacement, and Composite Action
    Li, Chaohui
    Lequesne, Remy D.
    Matamoros, Adolfo
    JOURNAL OF BRIDGE ENGINEERING, 2019, 24 (01)
  • [10] Mechanical and Economic Performance of Tied-Arch Bridges with Composite Deck
    Tang, Hu
    Shao, Chang-Yu
    Yan, Hai
    Bridge Construction, 2019, 49 (01) : 30 - 35