THE MEMBRANE METHOD OF ASSESSMENT OF ORGANIZATIONAL AND TECHNICAL RELIABILITY AND AGGREGATE RISK OF NPP CONSTRUCTION PROJECTS

被引:0
|
作者
Grabovy, Petr Grigorievich [1 ]
Sezemin, Denis Evgenyevich [1 ]
机构
[1] Moscow State Univ Civil Engn, Dept Construct Org & Real Estate Management, Moscow, Russia
关键词
nuclear power plant (NPP) construction; organizational and technical reliability management; mathematical modelling; computer risk modelling; risk management; industrial construction; ECONOMIC-DEVELOPMENT; CONTEXT;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study aims to enhance the organizational and technical reliability of design solutions in nuclear power plant (NPP) construction projects, particularly under risk conditions. It focuses on identifying effective strategies to manage and mitigate risks throughout the project life cycle, ensuring the successful and safe completion of technically complex NPP facilities. The conducted system analysis is the basis of methodical recommendations on the selection of a rational option for the organization of the construction of a nuclear power plant (NPP). The results of the research article are based on the analysis of practical activities of the participants of the construction project of a unique and technically complex NPP facility, aimed at improving the organizational and technical reliability of design solutions at all stages of the project life cycle under risk conditions. Conclusions and practical recommendations have been made on the basis of the author's membrane -method simulation model of risk analysis, developed using a modern approach to the application of automated systems of production process planning for the implementation of the NPP project.
引用
收藏
页码:143 / 158
页数:16
相关论文
共 50 条
  • [1] Financial and Organizational Models of NPP Construction Projects
    Ivanov, Timur
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2010, 55 (8-9): : 540 - +
  • [2] Assessment Reliability of Businesses as Components in Organizational Structure of Investment Construction Projects
    Morozenko, Andrey
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2016 - SMART CITY, 2017, 106
  • [3] Particulars of Risk Determination for Investments in NPP Construction Projects
    Koptelov, M. V.
    Guseva, A. I.
    [J]. ATOMIC ENERGY, 2014, 115 (03) : 207 - 213
  • [4] Particulars of Risk Determination for Investments in NPP Construction Projects
    M. V. Koptelov
    A. I. Guseva
    [J]. Atomic Energy, 2014, 115 : 207 - 213
  • [5] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [6] Risk assessment in construction projects of Iraq
    Alklkali, Ali Moosa Taqi
    [J]. JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (01) : 517 - 525
  • [7] Developing a risk assessment method for complex pipe jacking construction projects
    Cheng, Min
    Lu, Yujie
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 58 : 48 - 59
  • [8] Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects
    Chen, Peihong
    Wang, Jiaqiong
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 459 - +
  • [9] Aspects of Assessment of Organizational and Technical Reliability and Design of Construction Processes with Target Reliability Level using Computer-Aided Technologies
    Nikolaev, Yu. N.
    [J]. 2016 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2016,
  • [10] RELIABILITY, RISK MANAGEMENT, AND CONTINGENCY OF CONSTRUCTION PROCESSES AND PROJECTS
    Turskis, Zenonas
    Gajzler, Marcin
    Dziadosz, Agnieszka
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (02) : 290 - 298