THE MEMBRANE METHOD OF ASSESSMENT OF ORGANIZATIONAL AND TECHNICAL RELIABILITY AND AGGREGATE RISK OF NPP CONSTRUCTION PROJECTS

被引:0
|
作者
Grabovy, Petr Grigorievich [1 ]
Sezemin, Denis Evgenyevich [1 ]
机构
[1] Moscow State Univ Civil Engn, Dept Construct Org & Real Estate Management, Moscow, Russia
关键词
nuclear power plant (NPP) construction; organizational and technical reliability management; mathematical modelling; computer risk modelling; risk management; industrial construction; ECONOMIC-DEVELOPMENT; CONTEXT;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study aims to enhance the organizational and technical reliability of design solutions in nuclear power plant (NPP) construction projects, particularly under risk conditions. It focuses on identifying effective strategies to manage and mitigate risks throughout the project life cycle, ensuring the successful and safe completion of technically complex NPP facilities. The conducted system analysis is the basis of methodical recommendations on the selection of a rational option for the organization of the construction of a nuclear power plant (NPP). The results of the research article are based on the analysis of practical activities of the participants of the construction project of a unique and technically complex NPP facility, aimed at improving the organizational and technical reliability of design solutions at all stages of the project life cycle under risk conditions. Conclusions and practical recommendations have been made on the basis of the author's membrane -method simulation model of risk analysis, developed using a modern approach to the application of automated systems of production process planning for the implementation of the NPP project.
引用
收藏
页码:143 / 158
页数:16
相关论文
共 50 条
  • [41] The Construction of Phase Tracking Audit Risk Assessment System for the Implementation of Construction Projects
    Ma Xingyao
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (03): : 907 - 910
  • [42] The organizational and technological reliability improvement in construction by using failure prediction method
    Abdullayev, G. I.
    Velichkin, V. Z.
    Soldatenko, T. N.
    [J]. MAGAZINE OF CIVIL ENGINEERING, 2013, 38 (03): : 43 - +
  • [43] A Practical Method for Rapid Assessment of Reliability in Deep Excavation Projects
    Arabaninezhad, Arefeh
    Fakher, Ali
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2021, 45 (01) : 335 - 357
  • [44] A Practical Method for Rapid Assessment of Reliability in Deep Excavation Projects
    Arefeh Arabaninezhad
    Ali Fakher
    [J]. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2021, 45 : 335 - 357
  • [45] Risk assessment of construction projects using Monte Carlo simulation
    Qazi, Abroon
    Simsekler, Mecit Can Emre
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (05) : 1202 - 1218
  • [46] A Model for Risk Assessment and Management of Construction Projects in Urban Conditions
    Siemaszko, Agata
    Kristowski, Adam
    Grzyl, Beata
    [J]. 2018 BALTIC GEODETIC CONGRESS (BGC-GEOMATICS 2018), 2018, : 7 - 11
  • [47] Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry
    Adnan, Hamimah
    Rahmat, Mohd Nidzam
    Mazali, Nur Fatanah Nadiah
    Jusoff, Kamaruzaman
    [J]. JOURNAL OF POLITICS AND LAW, 2008, 1 (01) : 76 - 81
  • [48] Developing a multidimensional risk assessment model for sustainable construction projects
    Wuni, Ibrahim Yahaya
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [49] Development of a Blockchain Prototype for Collaborative Risk Assessment of Construction Projects
    Chung, In Bae
    Caldas, Carlos H.
    [J]. COMPUTING IN CIVIL ENGINEERING 2023-DATA, SENSING, AND ANALYTICS, 2024, : 547 - 554
  • [50] Risk assessment for 3D printing in construction projects
    Ahmed, Salma
    Romdhane, Lotfi
    El-Sayegh, Sameh Monir
    Manjikian, Solair
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2024,