共 50 条
- [36] Integration between the last planner system and the quality management system applied in the civil construction sector REVISTA INGENIERIA DE CONSTRUCCION, 2019, 34 (02): : 146 - 158
- [40] Integrating critical chain project management with last planner system for linear scheduling of modular construction CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (04): : 525 - 554