PROJECT SPEED AS METHODOLOGICAL PRINCIPLE OF ESTABLISHING OF CONTRACTUAL PRICES FOR WELLS CONSTRUCTION

被引:0
|
作者
GANIEV, RK
KHANOV, KM
机构
来源
NEFTYANOE KHOZYAISTVO | 1991年 / 08期
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
引用
收藏
页码:5 / 5
页数:1
相关论文
共 47 条
  • [31] A Study on the Management Mode of High-Speed Railway Construction Project in China
    Ma, Yuefeng
    Jiang, Shuai
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 187 - 190
  • [32] Information management model of construction schedule risk of high-speed railway project
    Liu, Weiqing
    Chen, Tingru
    Wei, Wanbing
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 426 - 430
  • [33] Full Span Precast and Launching Construction in Taiwan's High Speed Rail Project
    Tai, James C.
    Jang, Dennis
    Gaffney, Heather
    Flint, John
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 1: RAILROAD INFRASTRUCTURE ENGINEERING SAFETY, SECURITY AND ENVIRONMENT, 2010, : 167 - 173
  • [34] Projects as drivers of sustainability: How the adoption of the reuse principle affects the front-end of a construction project
    Rokio, Matias
    Ahola, Tuomas
    Alkki, Lauri
    Stahle, Matias
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2024, 42 (07)
  • [35] Impacts of high-speed rail construction on land prices in urban agglomerations: Evidence from Kyushu in Japan
    Okamoto, Chigusa
    Sato, Yasuhiro
    JOURNAL OF ASIAN ECONOMICS, 2021, 76
  • [36] Methodological experiences from the project "Interaction of Nursing and Medicine at the Hospital" - Construction processes of hierarchy, gender and occupational socialization
    Schlieper, B
    Sander, K
    GESUNDHEITSWESEN, 2001, 63 (8-9) : A12 - A12
  • [37] Developing a Methodological Framework for Estimating Temporary Drainage Capacity to Inform Land Requirements for a Highway Construction Project in Scotland
    Wallace, Mandy
    Meldrum, Anita
    Mickovski, Slobodan
    McNee, Iain
    Lear, Derwyn
    Flint, Sam
    SUSTAINABILITY, 2020, 12 (14)
  • [38] Research on the Construction Material Inventory of High-speed Rail Project Based on System Dynamics
    Zhu, Taoxing
    Wang, Hui
    Ge, Yong
    Song, Jingjing
    Journal of Railway Engineering Society, 2019, 36 (03): : 96 - 102
  • [39] Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project
    Moret, Yvonne
    Einstein, Herbert H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
  • [40] Establishing influence of design process performance on end-project goals in construction using process-based model
    Haponava, Tatsiana
    Al-Jibouri, Saad
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2010, 17 (05) : 657 - 676