Information management model of construction schedule risk of high-speed railway project

被引:0
|
作者
Liu, Weiqing [1 ]
Chen, Tingru [1 ]
Wei, Wanbing
机构
[1] Shijiazhuang Railway Inst, Sch Econ & Management, Shijiazhuang 050043, Peoples R China
关键词
high-speed railway; construction schedule risk; information management; control;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Construction schedule risk of high-speed railway has the characteristics of latency, chain reaction and causality induced, thus the effective prevention and control of risk are the key issue of study on construction schedule management. Based on the analysis of subjective and objective factors of the construction schedule risk, information management model of construction schedule risk and risk-control system of construction schedule were established to achieve the purpose of whole course monitoring, effective decision-making and dynamic control.
引用
收藏
页码:426 / 430
页数:5
相关论文
共 50 条
  • [1] A Study on the Management Mode of High-Speed Railway Construction Project in China
    Ma, Yuefeng
    Jiang, Shuai
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 187 - 190
  • [2] Preliminary Study of Management Information System of High-speed Railway Project
    Liu Yun
    Xu Wei
    Wang Guoxin
    Tang Jiong
    PROCEEDINGS OF SHANGHAI INTERNATIONAL CONFERENCE ON TECHNOLOGY OF ARCHITECTURE AND STRUCTURE, PT II, 2009, : 432 - 440
  • [3] Optimization model of existing stop schedule for high-speed railway
    Feng, Xu-Jie
    Sun, Quan-Xin
    Feng, Jia
    Wu, Ke-Qi
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2013, 13 (01): : 84 - 90
  • [4] Information-Based Construction of High-Speed Railway Tunnel
    Yang, Qian
    Wang, Zhaoling
    SHOCK AND VIBRATION, 2017, 2017
  • [5] Studying management mode of project quality for high-speed railway
    Wang, Mengjun
    Yu, Deming
    Zhang, Feilian
    Wang, Jin
    Changsha Tiedao Xuyuan Xuebao/Journal of Changsha Railway University, 2000, 18 (01): : 19 - 24
  • [6] Study and practice on integrated management model for high-speed railway construction projects in China
    China Railway Corporation, Beijing
    100844, China
    Tiedao Xuebao, 11 (1-8):
  • [7] THE INFORMATION CONSTRUCTION MANAGEMENT ABOUT INITIAL SUPPORT OF HIGH-SPEED RAILWAY TUNNEL IN LOESS REGION
    Hu, Shimin
    Zhang, Dingli
    LISS 2011: PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE, VOL 3, 2011, : 155 - 158
  • [8] Construction of the Korean high-speed railway
    Kee-dong, Kang
    Rail International, 2000, 31 (10):
  • [9] High-speed railway stopping schedule optimization model based on node service
    Li, D.-W. (lidw@bjtu.edu.cn), 1600, Science Press (35):
  • [10] Risk Analyses on Beijing-Tianjin High-Speed Railway Project
    Chen Jian
    You Wei
    Chen Wei-geng
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5161 - 5166