共 50 条
- [42] CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. CONSTRUCTION AND OPERATION OF HOT METAL PRETREATMENT EQUIPMENT [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S213 - S213
- [43] TECHNICAL DEVELOPMENT IN CONTINUOUS ANNEALING LINE AT MIZUSHIMA WORKS .2. METALLURGY ON PRODUCING OF COLD STRIP IN MIZUSHIMA CONTINUOUS ANNEALING LINE, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1471 - 1471
- [45] CONSTRUCTION AND OPERATION OF LADLE FURNACE FACILITIES IN NO 2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S247 - S247
- [47] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .2. DEVELOPMENT OF SLAB UNIFORM HEATING TECHNIQUES [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1197 - 1197
- [48] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI STEEL CORP .2. THE DEVELOPMENT OF CERAMICS INSULATION METHODS IN CONTINUOUS REHEATING FURNACE [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1182 - 1182
- [49] DEVELOPMENT OF A PROCESS FOR MANUFACTURING TFP (TRIMMING FREE PLATE) .1. OUTLINE OF ATTACHED EDGER AT MIZUSHIMA-PLATE-MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1116 - 1116
- [50] NEW COMPUTER CONTROL-SYSTEM OF HOT STRIP MILL IN MURORAN WORKS, NIPPON-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S313 - S313