INCREASING RELIABILITY AND EFFICIENCY OF INDIVIDUAL UNITS OF AUXILIARY EQUIPMENT OF KHTGZ K-300-240 TURBINE PLANT

被引:0
|
作者
LUZHNOV, MI
SHKOLNIK, GT
ZHILKIN, NA
KAZANSKII, VN
SHVARTSMAN, ML
BASKUNOV, RS
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:50 / +
页数:1
相关论文
共 31 条
  • [1] EFFICIENCY OF 300 MW UNITS WITH KHTGZ K-300-240 TURBINES WITH OPERATION AT VARIABLE PRESSURE
    TEPLITSKII, MG
    PROKOPENKO, AG
    KOCHIASHVILI, AL
    SHILIN, YP
    GOLYSHEV, LV
    THERMAL ENGINEERING, 1974, 21 (06) : 60 - 65
  • [2] CHEMICAL CLEANING OF KHTGZ K-300-240 TURBINE DURING MAJOR REPAIRS
    KLEIMENOV, NG
    ANDRYUSHIN, VM
    KORZHOV, EN
    AGAPOVA, AV
    THERMAL ENGINEERING, 1977, 24 (05) : 32 - 33
  • [3] EXPERIENCE OF STARTING KHTGZ K-300-240 TURBINE, USING FLANGE AND STUD HEATING SYSTEM
    KOSYAK, YF
    PROKOPEN.AG
    IOFFE, VY
    SHCHERBI.AV
    SUKHAREV, FM
    KALASHNI.VP
    THERMAL ENGINEERING, 1968, 15 (12) : 1 - &
  • [4] K-330-23.5 steam turbine for replacing K-300-240 turbines of KhTGZ past their lifetime
    Gudkov N.N.
    Kirillov V.I.
    Babiev A.N.
    Gudkov E.N.
    Petrova O.N.
    Adamson D.A.
    Ermolaev V.V.
    Shklyar A.I.
    Zhuchenko L.A.
    Dubrovskii V.G.
    Thermal Engineering, 2009, 56 (04) : 269 - 276
  • [5] INVESTIGATING EFFICIENCY OF A MODIFIED KHTGZ K-300-240-2 TURBINE
    TEPLITSKII, MG
    PROKOPENKO, AG
    ARKHIPOV, PS
    PYRCH, VA
    KRASNOSHTAN, NN
    THERMAL ENGINEERING, 1974, 21 (09) : 80 - 87
  • [6] WARMING UP CASINGS OF INTERMEDIATE PRESSURE DOUBLE-WALL CYLINDER OF KHTGZ K-300-240 TURBINE
    PROKOPENKO, AG
    STASYUK, NP
    TKACHUK, NV
    SHCHERBINA, AV
    THERMAL ENGINEERING, 1976, 23 (10) : 28 - 30
  • [7] REFINING CONDITIONS FOR CHEMICAL CLEANS OF KHTGZ K-300-240 TURBINES UNDER LOAD
    KLEIMENOV, NG
    ANDRYUSHIN, VM
    KORZHOV, EN
    AGAPOVA, AV
    THERMAL ENGINEERING, 1977, 24 (01) : 44 - 48
  • [8] COMBINED CLEANING OF A K-300-240 KHTGZ TURBINE USING WET STEAM AND AN AQUEOUS-SOLUTION OF REAGENTS UNDER PRESSURE
    KLEIMENO.NG
    ANDRYUSH.VM
    KORZHOV, EN
    AGAPOVA, AV
    THERMAL ENGINEERING, 1973, 20 (11) : 76 - 83
  • [9] DYNAMIC TESTING OF A FEEDHEATING SYSTEM WITHOUT A DEAERATOR FOR THE K-300-240 TURBINE PLANT
    EFIMOCHKIN, GI
    VERBITSKII, VL
    PROKOPENKO, AG
    STASYUK, NP
    YAKUSHIN, EK
    THERMAL ENGINEERING, 1991, 38 (11) : 604 - 608
  • [10] FEATURES OF KHTGZ K-300-240 TURBINE START UP ACCORDING TO STANDARD START UP PROCEDURE FOR A 300 MW 2-BOILER UNIT
    CHERNETSKII, NS
    POLYAKOV, VS
    FOLIN, YA
    POLYAKOV, VA
    GALATSAN, VN
    THERMAL ENGINEERING, 1970, 17 (02) : 16 - +