COMBINED CLEANING OF A K-300-240 KHTGZ TURBINE USING WET STEAM AND AN AQUEOUS-SOLUTION OF REAGENTS UNDER PRESSURE

被引:0
|
作者
KLEIMENO.NG
ANDRYUSH.VM
KORZHOV, EN
AGAPOVA, AV
机构
[1] STATE ORG & RATIONAL REG ELECT POWER PLANTS & NETWORKS CTR,MOSCOW,USSR
[2] PRIDNEPROVSKAYA CENT POWER STN,PRIDNEPROVSKAYA,USSR
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:76 / 83
页数:8
相关论文
共 19 条
  • [1] CHEMICAL CLEANING OF KHTGZ K-300-240 TURBINE DURING MAJOR REPAIRS
    KLEIMENOV, NG
    ANDRYUSHIN, VM
    KORZHOV, EN
    AGAPOVA, AV
    THERMAL ENGINEERING, 1977, 24 (05) : 32 - 33
  • [2] K-330-23.5 steam turbine for replacing K-300-240 turbines of KhTGZ past their lifetime
    Gudkov N.N.
    Kirillov V.I.
    Babiev A.N.
    Gudkov E.N.
    Petrova O.N.
    Adamson D.A.
    Ermolaev V.V.
    Shklyar A.I.
    Zhuchenko L.A.
    Dubrovskii V.G.
    Thermal Engineering, 2009, 56 (04) : 269 - 276
  • [3] EXPERIENCE OF STARTING KHTGZ K-300-240 TURBINE, USING FLANGE AND STUD HEATING SYSTEM
    KOSYAK, YF
    PROKOPEN.AG
    IOFFE, VY
    SHCHERBI.AV
    SUKHAREV, FM
    KALASHNI.VP
    THERMAL ENGINEERING, 1968, 15 (12) : 1 - &
  • [4] EFFICIENCY OF 300 MW UNITS WITH KHTGZ K-300-240 TURBINES WITH OPERATION AT VARIABLE PRESSURE
    TEPLITSKII, MG
    PROKOPENKO, AG
    KOCHIASHVILI, AL
    SHILIN, YP
    GOLYSHEV, LV
    THERMAL ENGINEERING, 1974, 21 (06) : 60 - 65
  • [5] WARMING UP CASINGS OF INTERMEDIATE PRESSURE DOUBLE-WALL CYLINDER OF KHTGZ K-300-240 TURBINE
    PROKOPENKO, AG
    STASYUK, NP
    TKACHUK, NV
    SHCHERBINA, AV
    THERMAL ENGINEERING, 1976, 23 (10) : 28 - 30
  • [6] REFINING CONDITIONS FOR CHEMICAL CLEANS OF KHTGZ K-300-240 TURBINES UNDER LOAD
    KLEIMENOV, NG
    ANDRYUSHIN, VM
    KORZHOV, EN
    AGAPOVA, AV
    THERMAL ENGINEERING, 1977, 24 (01) : 44 - 48
  • [7] COOLING AT K-300-240 STEAM TURBINE UNDER LOAD WITH STEAM CONVERTED TO A SATURATED STATE.
    Gerasimov, V.V.
    Zankovich, V.L.
    Lyashevich, N.A.
    Thermal Engineering (English translation of Teploenergetika), 1987, 34 (03): : 123 - 126
  • [8] INCREASING RELIABILITY AND EFFICIENCY OF INDIVIDUAL UNITS OF AUXILIARY EQUIPMENT OF KHTGZ K-300-240 TURBINE PLANT
    LUZHNOV, MI
    SHKOLNIK, GT
    ZHILKIN, NA
    KAZANSKII, VN
    SHVARTSMAN, ML
    BASKUNOV, RS
    THERMAL ENGINEERING, 1970, 17 (10) : 50 - +
  • [9] COOLING A K-300-240 STEAM-TURBINE UNDER LOAD WITH STEAM CONVERTED TO A SATURATED STATE
    GERASIMOV, VV
    ZANKOVICH, VL
    LYASHEVICH, NA
    THERMAL ENGINEERING, 1987, 34 (03) : 123 - 126
  • [10] Design Evaluation of the State of Stress and Cyclic Strength of High Pressure and Medium Pressure Cylinders of the K-300-240 KhTGZ Turbine.
    Berlyand, V.I.
    Pozhidaev, A.V.
    Palei, V.A.
    Levit, I.G.
    Teploenergetika, 1983, (02): : 38 - 42