INCREASING RELIABILITY AND EFFICIENCY OF INDIVIDUAL UNITS OF AUXILIARY EQUIPMENT OF KHTGZ K-300-240 TURBINE PLANT

被引:0
|
作者
LUZHNOV, MI
SHKOLNIK, GT
ZHILKIN, NA
KAZANSKII, VN
SHVARTSMAN, ML
BASKUNOV, RS
机构
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:50 / +
页数:1
相关论文
共 31 条
  • [21] COOLING AT K-300-240 STEAM TURBINE UNDER LOAD WITH STEAM CONVERTED TO A SATURATED STATE.
    Gerasimov, V.V.
    Zankovich, V.L.
    Lyashevich, N.A.
    Thermal Engineering (English translation of Teploenergetika), 1987, 34 (03): : 123 - 126
  • [22] COOLING A K-300-240 STEAM-TURBINE UNDER LOAD WITH STEAM CONVERTED TO A SATURATED STATE
    GERASIMOV, VV
    ZANKOVICH, VL
    LYASHEVICH, NA
    THERMAL ENGINEERING, 1987, 34 (03) : 123 - 126
  • [24] THE FORMATION OF SOLUTIONS OF CORROSIVE MEDIA IN THE FLOW SECTION OF THE LOW-PRESSURE CYLINDERS OF A K-300-240 TURBINE
    MARTYNOVA, OI
    POVAROV, OA
    ROSSIKHIN, LY
    POLEVOI, EN
    THERMAL ENGINEERING, 1988, 35 (01) : 25 - 29
  • [25] Ejectors of power plants turbine units efficiency and reliability increasing
    Aronson, K. E.
    Ryabchikov, A. Yu.
    Kuptsov, V. K.
    Murmanskii, I. B.
    Brodov, Yu. M.
    Zhelonkin, N. V.
    Khaet, S. I.
    INTERNATIONAL CONFERENCE PROBLEMS OF THERMAL PHYSICS AND POWER ENGINEERING (PTPPE-2017), 2017, 891
  • [26] SELECTING SIZE OF RADIAL CLEARANCES IN HIGH-PRESSURE CYLINDER AND INTERMEDIATE PRESSURE CYLINDER OF AN LMZ K-300-240 TURBINE
    PROKHORO.SA
    KUDRYAVY, VV
    THERMAL ENGINEERING, 1972, 19 (07) : 26 - 31
  • [27] INVESTIGATION OF A FEEDHEATING SYSTEM WITHOUT A DEAERATOR FOR THE LMZ-K-300-240 TURBINE PLANT
    EFIMOCHKIN, GI
    VERBITSKII, VL
    BERENSHTEIN, VM
    THERMAL ENGINEERING, 1984, 31 (06) : 336 - 339
  • [28] Reconstruction of the front end gland of the intermediate-pressure cylinder of the K-300-240 turbine at the Konakovskaya GREéS using mathematical modeling
    Radin Yu.A.
    Kontorovich T.S.
    Davydov A.V.
    Breiterman S.A.
    Danilov K.N.
    Sobolev B.M.
    Power Technology and Engineering, 2004, 38 (2) : 106 - 111
  • [29] INVESTIGATION OF EFFICIENCY OF LMZ K-800-240-2 TANDEM TURBINE PLANT AFTER PARTIAL MODIFICATION
    KOMAROV, NF
    KUNTIN, ES
    AZHIKIN, AG
    BORISOVA, NN
    THERMAL ENGINEERING, 1977, 24 (07) : 6 - 9
  • [30] Using an Absorption Heat Pump in the Regeneration System of Turbine Model K-300-240-2 Manufactured by Kharkov Turbo Generator Plant (KhTGP)
    Skubienko, S., V
    Yanchenko, I., V
    Babushkin, A. Yu
    2016 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2016,