AN EVALUATION OF CAPACITY SENSITIVE ORDER REVIEW AND RELEASE PROCEDURES IN JOB SHOPS

被引:68
|
作者
PHILIPOOM, PR
MALHOTRA, MK
JENSEN, JB
机构
[1] Department of Management Science, College of Business Administration, University of South Carolina, Columbia, South Carolina
关键词
D O I
10.1111/j.1540-5915.1993.tb00506.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We investigate the performance of capacity-sensitive order review and release (ORR) procedures in job shop environments that have not been previously explored. Previous research has ignored the case of job shops which must perform to very tight due-dates because of time-sensitive customers. We propose and test a new capacity sensitive ORR procedure called path based bottleneck (PBB) in such environments, along with the modified infinite loading (MIL) procedure which has been shown to work well in several studies. We compare the performance of these two controlled release rules with that of immediate release rule under different conditions of capacity utilization and customer specified exogenous due-dates. Our results indicate that PBB performs well in lowering total costs when due-dates are tight, while MIL is a better procedure with relatively loose to medium due-dates. We also show that in many cases, the shortest processing time (SPT) dispatching rule is a superior performer than a due-date based rule like critical ratio (CR); a conclusion which is contrary to the existing research in this area. In addition, the shop floor control policies recommended are shown to be sensitive to the cost structure of the firm. The managerial implications of this research in providing effective shop floor control in job shops operating under tight due-date conditions are also discussed.
引用
收藏
页码:1109 / 1133
页数:25
相关论文
共 50 条
  • [31] JOB RELEASE UNDER DUE DATE CONSTRAINTS IN JOB SHOPS WITH TIME-VARYING PRODUCT MIX
    Zhang, Tao
    Rose, Oliver
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2216 - 2226
  • [32] Deadlock-free scheduling of flexible job shops with limited capacity buffers
    Fahmy, Sherif A.
    ElMekkawy, Tarek Y.
    Balakrishnan, Subramaniam
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (03) : 231 - 252
  • [33] SEX BIAS IN JOB EVALUATION PROCEDURES
    ARVEY, RD
    PERSONNEL PSYCHOLOGY, 1986, 39 (02) : 315 - 335
  • [34] Lot synchronization in make-to-order shops with order release control: an assessment by simulation
    Fernandes, Nuno O.
    Thurer, Matthias
    Stevenson, Mark
    Carmo-Silva, Silvio
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (21) : 6724 - 6738
  • [35] Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops
    Meloni, Carlo
    Pranzo, Marco
    Sama, Marcella
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2022, 247
  • [36] Scheduling research in multiple resource constrained job shops: A review and critique
    Univ of North Carolina at Greensboro, Greensboro, United States
    Int J Prod Res, 8 (2077-2097):
  • [37] Scheduling research in multiple resource constrained job shops: A review and critique
    Gargeya, VB
    Deane, RH
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2077 - 2097
  • [38] Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops
    Meloni, Carlo
    Pranzo, Marco
    Samà, Marcella
    International Journal of Production Economics, 2022, 247
  • [39] PREEMPTIVE SCHEDULING OF INDEPENDENT JOBS WITH RELEASE AND DUE TIMES ON OPEN, FLOW AND JOB SHOPS
    CHO, Y
    SAHNI, S
    OPERATIONS RESEARCH, 1981, 29 (03) : 511 - 522
  • [40] DUE-DATE ASSIGNMENT PROCEDURES WITH DYNAMICALLY UPDATED COEFFICIENTS FOR MULTILEVEL ASSEMBLY JOB SHOPS
    ADAM, NR
    BERTRAND, JWM
    MOREHEAD, DC
    SURKIS, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 68 (02) : 212 - 227