共 50 条
- [43] COST-BENEFIT-ANALYSIS OF A 2-UNIT WARM STANDBY RELIABILITY SYSTEM WITH 2 TYPES OF REPAIR FACILITIES MICROELECTRONICS AND RELIABILITY, 1993, 33 (03): : 335 - 348
- [45] COST-BENEFIT-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH A PROVISO OF REPAIR-MACHINE FAILURE MICROELECTRONICS AND RELIABILITY, 1994, 34 (08): : 1391 - 1394
- [47] COST-BENEFIT-ANALYSIS OF A ONE-SERVER 2-UNIT SYSTEM SUBJECT TO SHOCK AND DEGRADATION MICROELECTRONICS AND RELIABILITY, 1986, 26 (03): : 499 - 518
- [48] MANUAL OF INDUSTRIAL PROJECT ANALYSIS IN DEVELOPING COUNTRIES .1. METHODOLOGY AND CASE STUDIES .2. SOCIAL COST BENEFIT ANALYSIS ECONOMIC JOURNAL, 1970, 80 (319): : 681 - 685
- [50] COST-BENEFIT-ANALYSIS OF A 2-SERVER, 2-UNIT, WARM STANDBY SYSTEM WITH DIFFERENT TYPES OF FAILURE MICROELECTRONICS AND RELIABILITY, 1992, 32 (10): : 1353 - 1359