共 50 条
- [31] S-EXPECTED NUMBER OF INSPECTIONS AND REPAIRS OF A ONE-SERVER 2-UNIT SYSTEM SUBJECT TO ARBITRARY FAILURE MICROELECTRONICS AND RELIABILITY, 1984, 24 (04): : 647 - 649
- [32] ON THE EXPECTED NET REVENUE OF A ONE-SERVER 2-UNIT SYSTEM WITH ARBITRARY INSTALLATION TIME MICROELECTRONICS AND RELIABILITY, 1986, 26 (01): : 45 - 48
- [33] COST-BENEFIT-ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH A PROVISO OF REPAIR-MACHINE FAILURE MICROELECTRONICS AND RELIABILITY, 1994, 34 (08): : 1391 - 1394
- [34] COST-BENEFIT-ANALYSIS OF A 2-UNIT WARM STANDBY RELIABILITY SYSTEM WITH 2 TYPES OF REPAIR FACILITIES MICROELECTRONICS AND RELIABILITY, 1993, 33 (03): : 335 - 348
- [35] COST-BENEFIT ANALYSIS OF A ONE-SERVER 2-NONIDENTICAL-UNIT COLD STANDBY SYSTEM WITH REPAIR AND PREVENTIVE MAINTENANCE MICROELECTRONICS AND RELIABILITY, 1985, 25 (05): : 991 - 1000
- [36] COST-BENEFIT-ANALYSIS OF A 1-SERVER N-UNIT SYSTEM SUBJECT TO GENERAL REPAIR AND INSPECTION MICROELECTRONICS AND RELIABILITY, 1983, 23 (03): : 531 - 540
- [37] ANALYSIS OF ONE-SERVER N-UNIT PARALLEL SYSTEM SUBJECT TO RANDOM SERVICE MICROELECTRONICS AND RELIABILITY, 1986, 26 (04): : 651 - 655
- [40] PROFIT ANALYSIS OF A ONE-SERVER ONE-UNIT SYSTEM WITH PARTIAL FAILURE SUBJECT TO RANDOM INSPECTION MICROELECTRONICS AND RELIABILITY, 1993, 33 (03): : 319 - 322