共 50 条
- [42] Study on Necessity and Safety Measures of Elevator Evacuation During High-rise Building Fire ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3023 - 3026
- [43] Experimental Study of Elevator Loading and Unloading Time During Evacuation in High-Rise Buildings Fire Technology, 2017, 53 : 29 - 42
- [44] Experimental study on vibration control for rope-sway of elevator of high-rise building PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 238 - 243
- [47] Spatio-temporal optimization of construction elevator planning in high-rise building projects DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2024, 17
- [49] Tornado-induced vibration assessment of construction elevator attached to high-rise buildings STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2024, 33 (13):
- [50] Study on Ventilation in High-Rise Building Based on Pressure Differences Measured at Elevator Doors 6TH INTERNATIONAL BUILDING PHYSICS CONFERENCE (IBPC 2015), 2015, 78 : 2712 - 2716