A DOUBLE-INTEGRAL EQUATION FOR THE AVERAGE RUN-LENGTH OF A MULTIVARIATE EXPONENTIALLY WEIGHTED MOVING AVERAGE CONTROL CHART

被引:41
|
作者
RIGDON, SE [1 ]
机构
[1] SO ILLINOIS UNIV,DEPT MATH & STAT,EDWARDSVILLE,IL 62026
关键词
MULTIVARIATE QUALITY CONTROL; HOTELLING T-2 CHART; ITERATED KERNELS;
D O I
10.1016/0167-7152(94)00196-F
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
The multivariate exponentially weighted moving average control chart is a control charting scheme that uses weighted averages of previously observed random vectors. This scheme, which is defined using Z(0) = mu(0), Z(i) = rX(i) + (1 - r)(i-1) (i greater than or equal to 1), where X(1), X(2),... denote the vector-valued output of a process, can be used to detect shifts in the process mean vector more quickly, on the average, than the usual Hotelling T-2 chart. We prove that for the special case mu = 0, Sigma = I, the average run length (ARL) depends on the initial value z(0) for the MEWMA statistic only through its magnitude and the angle it makes with the mean vector. This theorem is then used to derive an integral equation of the ARL. This integral equation involves a double integral, and the. unknown function is a function of two variables. ARLs can be obtained by approximating the solution to the integral equation. Previously, simulation was needed to approximate the ARLs.
引用
收藏
页码:365 / 373
页数:9
相关论文
共 50 条
  • [41] A Multivariate Homogeneously Weighted Moving Average Control Chart
    Adegoke, Nurudeen A.
    Abbasi, Saddam Akber
    Smith, Adam N. H.
    Anderson, Marti J.
    Pawley, Matthew D. M.
    IEEE ACCESS, 2019, 7 : 9586 - 9597
  • [42] A new double exponentially weighted moving average control chart using repetitive sampling
    Adeoti, Olatunde Adebayo
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2018, 35 (02) : 387 - 404
  • [43] On designing a robust double exponentially weighted moving average control chart for process monitoring
    Raji, Ishaq Adeyanju
    Abbas, Nasir
    Riaz, Muhammad
    TRANSACTIONS OF THE INSTITUTE OF MEASUREMENT AND CONTROL, 2018, 40 (15) : 4253 - 4265
  • [44] Double exponentially weighted moving average control chart with supplementary runs-rules
    Adeoti, Olatunde A.
    Malela-Majika, Jean-Claude
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2020, 17 (02): : 149 - 172
  • [45] A double exponentially weighted moving average chart for time between events
    Alevizakos, Vasileios
    Koukouvinos, Christos
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2020, 49 (10) : 2765 - 2784
  • [46] Multivariate Exponentially Weighted Moving Average Control Chart under Neutrosophic Environment: A Bootstrap Approach
    Saritha, M. B.
    Varadharajan, R.
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2024, 9 (04) : 835 - 843
  • [47] The multivariate exponentially weighted moving average chart for monitoring short production runs
    Lee, Ming Ha
    Tan, Vie Ming
    Haq, Abdul
    Khoo, Michael B. C.
    Chew, XinYing
    Teoh, Wei Lin
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2024, 53 (07) : 3554 - 3569
  • [48] Multivariate Exponentially Weighted Moving-Average Chart for Monitoring Poisson Observations
    Chen, Nan
    Li, Zhonghua
    Ou, Yanjing
    JOURNAL OF QUALITY TECHNOLOGY, 2015, 47 (03) : 252 - 263
  • [49] New modified exponentially weighted moving average-moving average control chart for process monitoring
    Talordphop, Khanittha
    Sukparungsee, Saowanit
    Areepong, Yupaporn
    CONNECTION SCIENCE, 2022, 34 (01) : 1981 - 1998
  • [50] Outliers' detection with a sensitive exponentially weighted moving average control chart
    Raji, Ishaq Adeyanju
    Riaz, Muhammad
    Abujiya, Mu'azu Ramat
    Abbas, Nasir
    Lee, Muhammad Hisyam
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (04) : 1790 - 1813